{"id":10314,"date":"2019-02-25T16:49:47","date_gmt":"2019-02-25T21:49:47","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=10314"},"modified":"2019-02-25T16:49:47","modified_gmt":"2019-02-25T21:49:47","slug":"commission-meeting-minutes-thursday-february-7-2019","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=10314","title":{"rendered":"Commission Meeting Minutes Thursday, February 7, 2019"},"content":{"rendered":"<p>For your consideration, please read the minutes from the Commission Meeting held on Thursday, February 7, 2019.<\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2019\/02\/Commission-Meeting-Minutes-2-7-19-with-Attachments.pdf\">Commission Meeting Minutes 2-7-19 with Attachments<\/a><\/p>\n<p>To read the minutes please open or download the pdf from the link above, or you may see more below.<\/p>\n<p><!--more--><\/p>\n<p><strong>Brunswick-Glynn County Joint Water and Sewer Commission<\/strong><\/p>\n<p><strong>1703 Gloucester Street, Brunswick, GA 31520<\/strong><\/p>\n<p><strong>Thursday, February 7, 2019 at 2:00 PM<\/strong><strong>\u00a0<\/strong><\/p>\n<h1>COMMISSION MINUTES<\/h1>\n<p><strong>PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>G. Ben Turnipseed, Chairman<\/strong><\/p>\n<p><strong>Steve Copeland, Vice-Chairman<\/strong><\/p>\n<p><strong>Donald Elliott, Commissioner<\/strong><\/p>\n<p><strong>Cornell L. Harvey, Commissioner<\/strong><\/p>\n<p><strong>Bob Duncan, Commissioner<\/strong><\/p>\n<p><strong>Tripp Stephens, Commissioner<\/strong><\/p>\n<p><strong>Wayne Neal, Commissioner<\/strong><strong>\u00a0<\/strong><\/p>\n<p><strong>ALSO PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>Jimmy Junkin, Executive Director<\/strong><\/p>\n<p><strong>Charlie Dorminy, Legal Counsel HBS<\/strong><\/p>\n<p><strong>Andrew Burroughs, Deputy Executive Director<\/strong><\/p>\n<p><strong>Todd Kline, Director of Engineering<\/strong><\/p>\n<p><strong>Pam Crosby, Director of Procurement<\/strong><\/p>\n<p><strong>John D. Donaghy, Director of Finance<\/strong><\/p>\n<p><strong>Jay Sellers, Director of Administration<\/strong><\/p>\n<p><strong>Kirk Young, Superintendent<\/strong><\/p>\n<p><strong>Alvin Lang, Supervisor<\/strong><\/p>\n<p><strong>Derrick Simmons, Superintendent<\/strong><\/p>\n<p><strong>Cindy Barnhart, T.S.I.<\/strong><\/p>\n<p><strong>Michelle Warner, G.M.A.<\/strong><\/p>\n<p><strong>Rocky Joyner, Segal Consulting<\/strong><\/p>\n<p><strong>Janice Meridith, Exec. Commission Administrator<\/strong><\/p>\n<p><strong>MEDIA PRESENT:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>Taylor Cooper, The Brunswick News<\/strong><\/p>\n<p><strong>Pamela Permar Shierling, The Islander<\/strong><\/p>\n<p>Chairman Turnipseed called the meeting to order at 2:00 PM.<\/p>\n<p>Commissioner Neal provided the invocation and Commissioner Elliott led the pledge.<\/p>\n<p><strong>PUBLIC COMMENT PERIOD<\/strong><\/p>\n<p>Chairman Turnipseed opened the public comment period.<\/p>\n<p><strong>Robbie Tucker, Tap-In Fees \u2013 <\/strong>Mr. Tucker has purchased a lot in Riverside to build a home on.\u00a0 He has received a tap-in fee estimate of approximately $10,000 and is concerned as to the extremely high cost to be allowed to tap-in to the system, and believes there should be some means of reducing that cost.\u00a0 He checked the costs of a well and septic sewer system which was much lower cost, however use of a septic tank system is not allowed on the marsh.<\/p>\n<p>There being no additional citizens for public comment, Chairman Turnipseed closed the public comment period.<\/p>\n<p><strong>EMPLOYEE RECOGNITION<\/strong><\/p>\n<p><strong>Gregory Keith Crowder \u2013 Wastewater Collection System Operator <\/strong><\/p>\n<p>Commissioner Harvey presented Gregory Keith Crowder with his Wastewater Collection System Operator certificate.\u00a0 Commissioner Harvey and Cindy Barnhart along with Superintendent Kirk Young and Supervisor Frank Clark congratulated Greg on his accomplishment.<\/p>\n<p><strong>Antonio Damond Simmons \u2013 Wastewater Operator Class 1 <\/strong><\/p>\n<p>Commissioner Harvey presented Antonio Damond Simmons with his Wastewater Operator Class 1 certificate.\u00a0 Commissioner Harvey and Cindy Barnhart along with Supervisor Alvin Lang congratulated Antonio on his accomplishment.<\/p>\n<p><strong>Harrison Larimore Jackson \u2013 Wastewater Operator Class 3 <\/strong><\/p>\n<p>Commissioner Harvey presented Harrison Larimore Jackson with his Wastewater Collection System Operator Class 3 certificate.\u00a0 Commissioner Harvey and Cindy Barnhart along with Supervisor Alvin Lang congratulated Harrison on his accomplishment.<\/p>\n<p><strong>APPROVAL<\/strong><\/p>\n<ol>\n<li><strong>Minutes from the January 23, 2019 Commissioners\u2019 Retreat Workshop Meeting <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Stephens made a motion seconded by Commissioner Neal to approve the minutes from the January 23, 2019 Commissioners\u2019 Retreat Workshop Meeting.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"2\">\n<li><strong>Minutes from the January 23, 2019 Executive Session <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Stephens made a motion seconded by Commissioner Duncan to approve the minutes from the January 23, 2019 Executive Session.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"3\">\n<li><strong>Minutes from the January 24, 2019 Regular Commission Meeting <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Harvey made a motion seconded by Commissioner Copeland to approve the minutes from the January 24, 2019 Regular Commission Meeting.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"4\">\n<li><strong>Minutes from the January 24, 2019 Executive Session (1) <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Harvey made a motion seconded by Commissioner Copeland to approve the minutes from the January 10, 2019 Executive Session (1).\u00a0 Motion carried 7-0-0.<\/u><strong style=\"font-size: 1rem;\">\u00a0<\/strong><\/p>\n<ol start=\"5\">\n<li><strong>Minutes from the January 24, 2019 Executive Session (2) <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Elliott to approve the minutes from the January 24, 2019 Executive Session (2).\u00a0 Motion carried 6-0-1. (Commissioner Harvey abstained due to absence from the session.)<\/u><strong style=\"font-size: 1rem;\">\u00a0<\/strong><\/p>\n<ol start=\"6\">\n<li><strong> Engineering Study RFP \u2013 B. Turnipseed<\/strong><\/li>\n<\/ol>\n<p>Chairman Turnipseed provided that there are numerous areas in Glynn County presently without public sewer.\u00a0 He noted that since the JWSC has adequate capacity to treat wastewater from additional customers a study should be completed to determine the cost to extend service to some of these areas.\u00a0 Chairman Turnipseed added that the study should provide construction cost estimates for each area with services provided by both a gravity collection system and a pressure collection system, and if authorized the study should be completed within 90 days.\u00a0 The three (3) initially designated areas with adequate density and location near the existing sewer system for this particular study are:\u00a0 The area west of Highway 341 and north of Highway 303; the area east of Highway 341 and north of Community Road and west of Old Jesup Road; and the Arco community.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Stephens to move that the JWSC staff develop a RFP to receive proposals for completion of an engineering study to provide sewer service to three (3) unserved areas in Glynn County.<\/u><\/p>\n<p>Commissioner Neal asked if there was any idea as to what the cost of the study might be, and the response was no.<\/p>\n<p>Chairman Turnipseed asked when staff may be able to have the RFP prepared and sent out, and Mr. Kline responded an estimate of 30 days for staff to prepare and advertise the RFP.<\/p>\n<p><u>Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"7\">\n<li><strong> LS4003 Engineering Contract Award<\/strong> \u2013 P. Crosby<\/li>\n<\/ol>\n<p>Pam Crosby presented the recommendation to award the contract for engineering services for the LS4003 Basin Improvements Project.\u00a0 This contract will include the engineering for the improvements to the pump station and some gravity sewer line in the immediate area. She noted that this is a part of the SPLOST 2016 referendum and that the project overall will benefit the greater downtown area of Brunswick.\u00a0 Mrs. Crosby noted that the RFP was issued on November 29, 2018 and a pre-proposal meeting was held on December 18, 2018 with ten (10) firms in attendance, of which seven (7) provided proposals received on January 13, 2019.\u00a0 She provided a RFP evaluation summary matrix for the Commissioners review, as well as noting the evaluation criteria and comments made by the evaluation team.<\/p>\n<p><u>Commissioner Copeland made a motion seconded by Commissioner Duncan to move that the Brunswick-Glynn County Joint Water and Sewer Commission enter into a contract with Hussey Gay Bell Engineers in the amount of $244,984.00 for Engineering Services proposal related to the SPLOST 2016 Collection System Modifications to the City of Brunswick LS4003 Basin Project.<\/u><\/p>\n<p>Commissioner Duncan asked about the proposals and the options that were offered within and if a single option was already determined and if the proposal encompassed that one option. Mrs. Crosby advised that the recommended proposal included looking at both options and advise which one is the best option.\u00a0 Commissioner Duncan asked how the $245K was arrived at with two options and one not yet selected as the final.\u00a0 Mrs. Crosby clarified that the proposal included the fees to design and the options were all inclusive; the firm will look into both options and determine the best one.\u00a0 The cost will not increase based on selecting the final option.<\/p>\n<p>Commissioner Stephens inquired if the evaluation points awarded for location were tiered based on distance, and Mrs. Crosby replied yes, they were.<\/p>\n<p><u>Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"8\">\n<li><strong> \u201cL\u201d Street Project\/MOU with City of Brunswick<\/strong> \u2013 T. Kline<\/li>\n<\/ol>\n<p>Todd Kline presented the recommendation execution of a MOU with the City of Brunswick to participate in the construction portion of the \u201cL\u201d Street Project where the City of Brunswick is doing some roadway and drainage improvements between Martin Luther King Jr. Blvd. and Glynn Avenue.\u00a0 While the roads are under construction, JWSC would like to repair, replace and make overall improvements to the water and sewer system in that area.\u00a0 Mr. Kline highlighted the bidding process and further negotiations with the bidder due to the original bid coming in significantly higher than the cost estimate of the project.\u00a0 The revised estimate for the water systems improvements was $711,080.00.\u00a0 JWSC staff recommended adding a 5% contingency based on the changes anticipated on the bid quantities, which brought the new estimated cost of construction including contingency to $746,634.00. Mr. Kline provided that with the JWSC portion of the bid approved and the MOU approved, the City of Brunswick will be able to proceed with the total contract award to Georgia Asphalt Producers, Inc.\u00a0 He also noted that the preconstruction meeting will be held in mid to late February and construction will commence shortly thereafter, with the contract having a 365 day term.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Copeland to move that the approval be granted to enter into a Memorandum Of Understanding for the City of Brunswick in the estimated amount of $746,634.00 for water-related portions of the L Street Reconstruction Project.\u00a0<\/u><\/p>\n<p>Commissioner Duncan asked who the project manager will be on the utility portion, and Mr. Kline provided that he and staff from JWSC Planning &amp; Construction would be providing construction oversight.\u00a0 Commissioner Duncan then inquired about the major milestones such as early start date and late construction date.\u00a0 Mr. Kline noted that the expectation of the City is that the overall complete project including paving of roadways and such is 365 days, however the water-related portion is expected to be much shorter than that, and at a later date he can provide that detail.<\/p>\n<p>Commissioner Harvey provided that the City, being aware of what happened on the Mansfield Project and that contract, has addressed the manner in which contracts are constructed and prepared.\u00a0 He also noted that the L Street Project is a high priority project for the City and due diligence has been done to ensure this contract does not linger.<\/p>\n<p>Chairman Turnipseed asked if the water lines will be installed first, and Mr. Kline responded that was the intent of the approach and made the most sense since water lines typically are installed deeper than the storm drainage lines and other utility lines, and then the roadway paving would be last.<\/p>\n<p><u>Motion carried 7-0-0.<\/u><\/p>\n<ol start=\"9\">\n<li><strong> Oak Grove Comprehensive Agreement<\/strong> \u2013 C. Dorminy<\/li>\n<\/ol>\n<p>Charlie Dorminy presented the Oak Comprehensive Agreement to the Commissioners.\u00a0 He provided that Carolina Holdings Group Partners, LLC (\u201cDeveloper\u201d) has contracted to purchase property owned by Oak Grove Island Limited, LLP and governed by the Oak Grove Island Plantation Planned Development (the \u201cProperty\u201d) which is not connected to the public sewer system.\u00a0 The Developer wishes to extend public sewer from LS4132, which is an existing yet non-functioning JWSC pump station, as a part of its plan of development of the Property.\u00a0 Mr. Dorminy noted that the Developer had previously submitted an Unsolicited Proposal which was approved by the JWSC, and that staff has since worked with the Developer to negotiate the Comprehensive Agreement in which the Developer proposes to fund and contract for the necessary improvements to provide public wastewater service to the Property.\u00a0 He added that the JWSC will bid and award the Project.\u00a0 Also, regardless of who contracts for and manages the Project, JWSC has the right to inspect and approve all sewer construction The Developer will pay the costs of the Project and receive credit toward Capital improvement Fees.\u00a0 All other administrative and monthly fees will be paid for by Developer upon redeeming credit for the Development CIF\u2019s following construction of the Project.\u00a0 If the costs of the Project exceed the CIF\u2019s, the Developer will be reimbursed on a 70\/30 agreement for 5 years from completion of the Project. Mr. Dorminy further provided that the JWSC agrees to reserve and guarantee sewer capacity and System access for the Development upon the completion of the Project.\u00a0 The Developer will obtain all approvals necessary from the Glynn County Development Department prior to accessing the System.\u00a0 The Developer will either redeem the credit for the CIF\u2019s or pay the associated fees as outlined in the then-current JWSC Rate Resolution. The final details Mr. Dorminy noted included that the Agreement will terminate ten (10) years from the Effective Date, however the Reservation of Capacity and credits for amounts paid under Section 4, will be perpetual upon the completion of the Project and payment of the Capital Improvement Fees.\u00a0 The JWSC will not be liable for any further obligation to the Developer following termination of the Agreement; the Indemnification provision of the Agreement will survive the termination of the Agreement; and the 70\/30 Reimbursement obligation will expire five years from completion of the Project as set forth herein.<\/p>\n<p>Commissioner Elliott inquired as to how much capacity was being reserved, and Mr. Dorminy replied that it was capacity for 150 townhomes as provided in the Agreement and also noted in the Preliminary Engineering Report.\u00a0 Mr. Kline added that it was 1 REU per townhome.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Elliott to move that the JWSC approve the Comprehensive Agreement with Carolina Holdings Group Partners, LLC and authorize the Chairman to execute the same. \u00a0Motion carried 7-0-0.<\/u><\/p>\n<p>Commissioner Duncan clarified that the pump station was built by a previous developer yet never completed, so this is not a repair to an existing pump station, it is in effect a new pump station.<\/p>\n<p>Commissioner Stephens asked if the rest of the existing infrastructure is in good shape, and Mr. Burroughs responded that the force main had not been camera\u2019d but the downstream gravity is in acceptable shape.<\/p>\n<p>Commissioner Elliott questioned if we make any adjustment in tap fees, either up or down, how does that affect this Agreement?\u00a0 Mr. Dorminy provided that the redemption amount would be as of today, so they are not taking any risk that the tap fees may go up.\u00a0 He added that the 70\/30 would also be affected and that is paid back at the then current rates.\u00a0 So, if the tap fees go down, the Developer is assuming that risk as well. Mr. Dorminy provided that section and page on the Agreement where these details are noted.<\/p>\n<p>Chairman Turnipseed asked who would be preparing the plans and specifications, and Mr. Burroughs provided that Robert\u2019s Civil Engineering would or the Developer who would be paying for the plans and specifications.\u00a0 He added that JWSC would bid the project in order to ensure that the credit amount is verified and it is confirmed what that amount should be.<\/p>\n<p>Commissioner Stephens asked if the documents were sent out in advance for review, and it was noted that they had been finalized the evening before.\u00a0 It was requested that the Developers be made aware that if the documents needed to be provided a week in advance in order to be on the next week\u2019s agenda so that the Commissioners have the opportunity to review the documents.<\/p>\n<p>Commissioner Neal asked if there was any provision for other residents of Oak Grove to use this system.\u00a0 Mr. Burroughs commented that according to the Developer this had been discussed at an Oak Grove HOA meeting, and that once the system is installed JWSC will allow anyone who pays the tap fee to tie onto the system.<\/p>\n<p>Chairman Turnipseed asked if the Developer had all of the easements to construct the project, and Mr. Burroughs noted yes, according to the Developer they do.\u00a0 Mr. Dorminy added that the easements would be included with the dedication.<\/p>\n<p>Chairman Turnipseed noted concern as to not having had the opportunity to review the documents and being asked to vote on it without a thorough review.<\/p>\n<p>Commissioner Duncan then asked if this Agreement differs materially from other agreements that the Commission has approved.\u00a0 Mr. Dorminy responded no it did not, it was the same format, and he added that the plans have not changed since the original presentation of the Unsolicited Proposal for approval of the application at an earlier Commission meeting.\u00a0 He noted the delay of the final Agreement document was due to the process of working with staff and the attorneys in tweaking the details.<\/p>\n<p>After some clarification of terms in the Agreement, a vote was taken.<\/p>\n<p><u>Motion carried 7-0-0.<\/u><\/p>\n<p><strong>DISCUSSION<\/strong><\/p>\n<ol>\n<li><strong> GMA Defined Benefit Plan<\/strong> \u2013 J. Donaghy<\/li>\n<\/ol>\n<p>John Donaghy introduced Michelle Warner from Georgia Municipal Association and Rocky Joyner of Segal Consulting who were invited to give a presentation regarding the JWSC Defined Benefit Plan.\u00a0 Ms. Warner explained the information contained in the documents provided and then turned the presentation over to Mr. Joyner.\u00a0 Mr. Joyner reviewed the summary of key valuation results, gave an overview of the current plan provisions, the valuation history of the plan, and status of funding.\u00a0 Commissioner Copeland asked how the requirement for no employee contributions compared to other plans around the state.\u00a0 Mr. Joyner provided that there are 280 GMEBS in the state, and of that 280 between 20 and 25 total have employee contributions included in the plan, and all the rest are funded by the employer, and it is rare for employees to be required to contribute to the plans.\u00a0 Mr. Joyner continued to discuss the investments and returns, future projections, and also the retirement plan structure.<\/p>\n<ol start=\"2\">\n<li><strong> Project Update<\/strong> \u2013 T. Kline<\/li>\n<\/ol>\n<p>Todd Kline presented the monthly Project Update to the Commissioners.\u00a0 He noted the sections of the report and what was reflected in each.\u00a0 Mr. Kline highlighted the SPLOST 2016 North Mainland Improvements Project Phases 2 &amp; 3 and noted that the pre-proposal meeting had been held with a good showing of engineering firms in attendance, and a site tour had been done as well.\u00a0 February 20, 2019 is the revised submittal date for proposals to be received, with the evaluation process to being immediately after. Mr. Kline added that Southeast Pipe is doing some CCTV work, TV\u2019ing the gravity sewer mains in preparation for construction of that project.\u00a0<strong>\u00a0<\/strong><\/p>\n<p><strong>EXECUTIVE DIRECTOR\u2019S UPDATE<\/strong><\/p>\n<p>Mr. Junkin updated the Commissioners that senior staff had attended a two day workshop with the BB&amp;T Leadership Institute.\u00a0 He briefly explained the purpose of the workshop and the results of the two day session. Last thing discovered in the session which he noted as a glowing outcome, was to look at some needs involved in implementing necessary changes and resources available to make those changes.\u00a0 Mr. Junkin noted that staff is still working to some summary information to finalize resolution with the County to free up the monies from SPLOST V on Holly Street Project to do some repairs in the Sea Palms area.\u00a0 Mr. Junkin\u2019s final update was that staff has worked through many of the issues the Commissioners asked him to work on as a result of the Commissioners\u2019 Retreat.\u00a0 He added that staff is making good progress on those items and a summary will be provided to the Commissioners.\u00a0<strong>\u00a0<\/strong><\/p>\n<p><strong>CHAIRMAN\u2019S UPDATE and COMMITTEE APPOINTMENTS<\/strong><\/p>\n<p>Chairman Turnipseed presented the committee appointments.<\/p>\n<p><u>Communications Committee:<\/u>\u00a0 Commissioner Stephens\u2013Chairman, Commissioner Elliott, and Commissioner Duncan.<\/p>\n<p><u>Economic Development Committee:<\/u>\u00a0 Commissioner Duncan\u2013Chairman, Commissioner Neal, and Commissioner Harvey.<\/p>\n<p><u>Facilities Committee:<\/u>\u00a0 Chairman Turnipseed\u2013Chairman, Commissioner Duncan, and Commissioner Copeland.<\/p>\n<p><u>Finance Committee:<\/u>\u00a0 Commissioner Copeland\u2013Chairman, Commissioner Elliott, and Commissioner Stephens.<\/p>\n<p><u>Human Resources Committee:<\/u>\u00a0 Commissioner Elliott\u2013Chairman, Commissioner Harvey, and Commissioner Neal.<\/p>\n<p><u>Legislative Committee:<\/u>\u00a0 Commissioner Harvey\u2013Chairman, Commissioner Neal, and Commissioner Duncan.<\/p>\n<p><u>Emergency Preparedness Committee:<\/u>\u00a0 Commissioner Stephens\u2013Chairman, Commissioner Neal, and Commissioner Harvey.<\/p>\n<p>While some committees may meet monthly, others may only meet as necessary.<\/p>\n<p>Commissioner Stephens noted that two of the Commissioners and Mr. Junkin would be absent for the March 7<sup>th<\/sup> Commission Meeting.<\/p>\n<p><strong>EXECUTIVE SESSION<\/strong><\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Neal to go into Executive Session to discuss Property with no vote to be taken.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<p>Return to Regular Session.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Harvey to adjourn from Executive Session.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<p><u>Commissioner Harvey made a motion seconded by Commissioner Neal to adjourn the Commission Meeting.\u00a0 Motion carried 7-0-0.<\/u><\/p>\n<p>There being no additional business to bring before the Commission, Chairman Turnipseed adjourned the meeting at 3:56 p.m.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For your consideration, please read the minutes from the Commission Meeting held on Thursday, February 7, 2019. Commission Meeting Minutes 2-7-19 with Attachments To read the minutes please open or download the pdf from the link above, or you may see more below.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[2],"tags":[],"class_list":["post-10314","post","type-post","status-publish","format-standard","hentry","category-commission-meeting-minutes"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/10314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10314"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/10314\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}