{"id":11071,"date":"2019-06-11T15:04:34","date_gmt":"2019-06-11T19:04:34","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=11071"},"modified":"2019-06-11T15:04:34","modified_gmt":"2019-06-11T19:04:34","slug":"commission-meeting-minutes-thursday-may-2-2019","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=11071","title":{"rendered":"Commission Meeting Minutes Thursday, May 2, 2019"},"content":{"rendered":"<p>For your consideration, please read the minutes from the Commission Meeting held on Thursday, May 2, 2019.<\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2019\/06\/Commission-Meeting-Minutes-5-2-19-with-Attachments.pdf\">Commission Meeting Minutes 5-2-19 with Attachments<\/a><\/p>\n<p>To read the minutes, please open or download the pdf from the link above, or you may see more below.<\/p>\n<p><!--more--><\/p>\n<p><strong>Brunswick-Glynn County Joint Water and Sewer Commission<\/strong><\/p>\n<p><strong>1703 Gloucester Street, Brunswick, GA 31520<\/strong><\/p>\n<p><strong>Thursday, May 2, 2019 at 2:00 PM<\/strong><\/p>\n<h2><strong>\u00a0<\/strong>COMMISSION MINUTES<\/h2>\n<p><strong>\u00a0<\/strong><strong>PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>G. Ben Turnipseed, Chairman<\/strong><\/p>\n<p><strong>Steve Copeland, Vice-Chairman<\/strong><\/p>\n<p><strong>Donald Elliott, Commissioner<\/strong><\/p>\n<p><strong>Tripp Stephens, Commissioner<\/strong><\/p>\n<p><strong>Wayne Neal, Commissioner<\/strong><\/p>\n<p><strong>Bob Duncan, Commissioner<\/strong><\/p>\n<p><strong>ALSO PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/strong><\/p>\n<p><strong> Jimmy Junkin, Executive Director<\/strong><\/p>\n<p><strong>Charlie Dorminy, Legal Counsel HBS<\/strong><\/p>\n<p><strong>Andrew Burroughs, Deputy Executive Director<\/strong><\/p>\n<p><strong>Todd Kline, Director of Engineering<\/strong><\/p>\n<p><strong>Pam Crosby, Director of Procurement<\/strong><\/p>\n<p><strong>John D. Donaghy, Director of Finance<\/strong><\/p>\n<p><strong>Jay Sellers, Director of Administration<\/strong><\/p>\n<p><strong>Janice Meridith, Exec. Commission Administrator<\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>ABSENT:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>Cornell L. Harvey, Commissioner<\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>MEDIA PRESENT:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p><strong>Taylor Cooper, The Brunswick News<\/strong><\/p>\n<p><strong>Pamela Permar Shierling, The Islander<\/strong><\/p>\n<p>Chairman Turnipseed called the meeting to order at 2:00 PM.<\/p>\n<p>Commissioner Neal provided the invocation and Commissioner Duncan led the pledge.<\/p>\n<p><strong>\u00a0<\/strong><strong>PUBLIC COMMENT PERIOD<\/strong><\/p>\n<p>Chairman Turnipseed opened the public comment period.<\/p>\n<p><strong>Calvin Waye, Fire Hydrants for Old Buck Swamp Area<\/strong> \u2013 Mr. Waye commented that as the President of the Tri-Area Association in the Brookman, Buck Swamp and Fancy Bluff Area, he has often been receiving questions about the original Buck Swamp area, specifically regarding the need for fire hydrants and the lack thereof.\u00a0 There are residents in the area as well as a church, and they have been asking why do all of the fire hydrants go out towards the newer parts of Buck Swamp and there are none in the original portion?\u00a0 This is a need for safety purposes as well as insurance premium costs which are higher when there is a lack of presence of fire hydrants.\u00a0 Mr. Waye is asking for immediate attention in providing fire hydrants in this area.<\/p>\n<p>Chairman Turnipseed thanked Mr. Waye for his commentary.<\/p>\n<p>There being no additional citizens for public comment, Chairman Turnipseed closed the public comment period.<\/p>\n<p><strong>COMMITTEE UPDATES<\/strong><\/p>\n<p>There were no committee updates.<\/p>\n<p><strong>APPROVAL<\/strong><\/p>\n<ol>\n<li><strong>Minutes from the April 18, 2019 Regular Commission Meeting <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Stephens to approve the minutes from the April 18, 2019 Regular Commission Meeting.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<p>Chairman Turnipseed requested a motion to excuse Commissioner Harvey from the meeting due to being out of town on business.<\/p>\n<p><u>Commissioner Stephens made a motion seconded by Commissioner Neal to excuse Commissioner Harvey from the meeting.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<ol start=\"2\">\n<li><strong>Minutes from the April 18, 2019 Executive Session <\/strong><\/li>\n<\/ol>\n<p><u>Commissioner Neal made a motion seconded by Commissioner Copeland to approve the minutes from the April 18, 2019 Executive Session.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><strong>\u00a0<\/strong><\/p>\n<ol start=\"3\">\n<li><strong> Intergovernmental Agreement \u2013 Sea Palms Sewer Rehabilitation<\/strong> \u2013 C. Dorminy<\/li>\n<\/ol>\n<p>Charlie Dorminy provided the Commissioners with a copy of the proposed SPLOST V Intergovernmental Agreement between Glynn County and JWSC regarding the SPLOST V Sewer Line Rehabilitation Project for their review.\u00a0 He recalled for the Commissioners that the SPLOST V projects for Glynn County included various water and sewer capital outlay projects, including the SPLOST V project known and described as \u201cSewer line Rehabilitation\u201d.\u00a0 The JWSC has identified this as a qualifying project within the Sea Palms development.\u00a0 The Intergovernmental Agreement is required by law to be entered into in order for the County to be able to provide SPLOST V funds to the JWSC, and so that JWSC may manage the project.\u00a0 Mr. Dorminy then gave an overview of the proposal and agreement for the Commission.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Stephens to move that the JWSC enter into the SPLOST 2005 Intergovernmental Agreement for Sea Palms Sewer Line Rehabilitation.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<p><strong>DISCUSSION<\/strong><\/p>\n<ol>\n<li><strong> Meter Replacement RFP Update<\/strong> \u2013 J. Junkin<\/li>\n<\/ol>\n<p>Mr. Junkin provided an update on the progress of the Meter Replacement Request For Proposal (RFP).\u00a0 He indicated that the AMR telemetry batteries through the system are failing.\u00a0 BGJWSC desires to replace the current meters systematically with AMI or Advanced Metering Infrastructure.\u00a0 Mr. Junkin advised that staff is in the process of finalizing a Request For Proposals to solicit AMI providers to provide new metering infrastructure with telemetry capabilities to support AMI such that water meters are monitored in near real time.\u00a0 After the proposals are received and evaluated, the proposing vendors will be reduced to a short list.\u00a0 Those on the short list will be allowed to do a pilot study for 6 months using the technology they proposed and to find out what the capabilities are for the technology.\u00a0 Financing will be a significant consideration as well as customer access and customer support via internet access to the data being generated by the water meters serving each customer which is very important.\u00a0 Mr. Junkin provided a preliminary schedule of execution for the project and also a draft of the RFP Initial Evaluation and Technical Worksheet for the Commissioners\u2019 review.\u00a0 Commissioner Elliott questioned if JWSC is requesting a particular lifespan for the meters in the RFP.\u00a0 He suggested that the RFP language should include a minimum life for the battery and the head, and that if these do not achieve their minimum life that the vendor replace it at their cost to include both the battery and the head, and then provided the reason for his suggestion.\u00a0 The Commission further discussed various details and outcomes that should be expected.\u00a0 The RFP is expected to be for advertisement in June 2019.<\/p>\n<ol start=\"2\">\n<li><strong> Whitlock Avenue Sewer Blockage\/Collapse Update \u2013<\/strong> J. Junkin<\/li>\n<\/ol>\n<p>Mr. Junkin provided highlights and a summary update on the Whitlock Avenue sewer blockage and collapse found on April 18, 2019.\u00a0 He discussed the CCTV that was done on the line and where there were issues and blockage found by Bloodhound that did the CCTV work.\u00a0 He commended the staff who worked on the repairs to the initial collapsed 30\u201d line and sinkhole as well as the second collapse and sinkhole.\u00a0 There was a total of 545\u2019 of line that had to be replaced.\u00a0 Jay Sellers provided a descriptive video of the collapses and sinkholes, included CCTV video of the interior of the lines, and detailed the work that was required for the repairs not only on Whitlock Avenue, but also additional sinkholes that occurred on B&amp;W Grade Road.\u00a0 After additional discussion between the Commission and staff, Chairman Turnipseed commended staff for the quick responses and hard work.\u00a0 Commissioner Neal also complimented staff on the frequent updates during the work.<\/p>\n<ol start=\"3\">\n<li><strong> Proposals for Academy Creek and Dunbar Creek Upgrades \u2013<\/strong> J. Junkin<\/li>\n<\/ol>\n<p>Mr. Junkin provided that five responses had been received from engineering firms on the previous day, and noted that the evaluation team is in the process of reviewing those.\u00a0 Initial scoring is expected to be completed by May 10<sup>th<\/sup>.\u00a0 After the initial review, interviews will be conducted with the five proposing firms on May 13<sup>th<\/sup> and 14<sup>th<\/sup>.\u00a0 A final recommendation will be presented to the Facilities Committee and Commission soon thereafter.<\/p>\n<p><strong>EXECUTIVE DIRECTOR\u2019S UPDATE<\/strong><\/p>\n<p>Mr. Junkin acknowledged and congratulated Chairman Turnipseed on becoming a member of the Georgia Tech Hall of Fame.\u00a0 Mr. Junkin then commented that the RFP for the solids hauling roll-off truck is going out for advertisement on May 3<sup>rd<\/sup> with one month for responses, and a few more months before an order would be filled.\u00a0 He added that the inventory analysis is in process.\u00a0 Also noted was that the critical equipment inventory requiring preventive maintenance is in process; that equipment will be receiving scored for determining the worst in need of preventive maintenance.\u00a0\u00a0 Mr. Junkin updated that the smoke testing project started in East Beach. \u00a0He provided that an emergency preparedness table top drill will be held at end of May at the EOC. \u00a0It is expected that four staff members will attend.\u00a0 He added that staff will reach out to Commissioner Stephens to schedule an Emergency Preparedness Committee Meeting.<\/p>\n<p><strong>CHAIRMAN\u2019S UPDATE <\/strong><\/p>\n<p>Chairman Turnipseed recommended that the Commissioners attend the Georgia Rural Water Association Conference on Jekyll Island.<\/p>\n<p><strong>EXECUTIVE SESSION<\/strong><\/p>\n<p>Chairman Turnipseed advised that there would be an executive session to discuss litigation and personnel with no vote to be taken after.<\/p>\n<p><u>Commissioner Copeland made a motion seconded by Commissioner Stephens to enter into Executive Session to discuss Litigation and Personnel.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<p>Return to Regular Session.<\/p>\n<p><u>Commissioner Duncan made a motion seconded by Commissioner Stephens to return to regular session.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<p>Chairman Turnipseed requested a motion to adjourn the meeting.<\/p>\n<p><u>Commissioner Stephens made a motion seconded by Commissioner Duncan to adjourn the meeting.\u00a0 Motion carried 6-0-1.\u00a0 (Commissioner Harvey was absent from the meeting.)<\/u><\/p>\n<p>There being no additional business to bring before the Commission, Chairman Turnipseed adjourned the meeting at 3:46 p.m.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For your consideration, please read the minutes from the Commission Meeting held on Thursday, May 2, 2019. Commission Meeting Minutes 5-2-19 with Attachments To read the minutes, please open or download the pdf from the link above, or you may see more below.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[2],"tags":[],"class_list":["post-11071","post","type-post","status-publish","format-standard","hentry","category-commission-meeting-minutes"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/11071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11071"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/11071\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}