{"id":18674,"date":"2020-07-24T08:56:42","date_gmt":"2020-07-24T12:56:42","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=18674"},"modified":"2020-07-24T08:56:42","modified_gmt":"2020-07-24T12:56:42","slug":"itb-21-001-pump-station-4021-rehabilitation-and-upgrade-project-no-904-for-the-bgjwsc","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=18674","title":{"rendered":"ITB 21-001 Pump Station 4021 Rehabilitation and Upgrade Project No. 904 for the BGJWSC"},"content":{"rendered":"<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/21-001-PS-4021-REHABILITATION-UPGRADE-PROJECT-07.24.2020.docx.pdf\">21-001 PS 4021 REHABILITATION UPGRADE PROJECT <\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/PS-4021-Full-Plans-July-2020.pdf\">PS 4021 Full Plans July 2020<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/Staff-Sign-in-Sheet-For-Pre-Proposal-Meeting-Aug-12.pdf\">Staff Sign-in Sheet For Pre-Proposal Meeting Aug 12<\/a><\/strong><\/p>\n<p><strong> <a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/IFB-21-001-Pre-Bid-Attendance-08-12-20.pdf\">IFB 21-001 Pre-Bid Attendance 08-12-20<\/a><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/PS4021-UpStream-Downstream-Manhole-Drawing.pdf\">PS4021 <\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/PS4021-UpStream-Downstream-Manhole-Drawing.pdf\">PS 4021 UpStream Downstream Manhole Drawing<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/IFB-21-001-Addendum-No.-1-PS4021-Rehabilitation.pdf\">IFB 21-001 Addendum No. 1 &#8212; PS4021 Rehabilitation<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/IFB-21-001-Addendum-No.-2-PS4021-Rehabilitation.pdf\">IFB 21-001 Addendum No. 2 &#8212; PS4021 Rehabilitation<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/IFB-21-001-PS-4021-Bid-Opening-Attendance-24AUG20.pdf\">IFB 21-001 PS 4021 Bid Opening Attendance 24AUG20<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/Bids-Submitted-08-25-2020.pdf\">Bids Submitted 08-25-2020<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2020\/07\/Notice-of-Award-Pump-Station-4021.pdf\">Notice of Award &#8212; Pump Station 4021<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>21-001 PS 4021 REHABILITATION UPGRADE PROJECT PS 4021 Full Plans July 2020 Staff Sign-in Sheet For Pre-Proposal Meeting Aug 12 IFB 21-001 Pre-Bid Attendance 08-12-20PS4021 PS 4021 UpStream Downstream Manhole Drawing IFB 21-001 Addendum No. 1 &#8212; PS4021 Rehabilitation IFB 21-001 Addendum No. 2 &#8212; PS4021 Rehabilitation IFB 21-001 PS 4021 Bid Opening Attendance 24AUG20 [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[22],"tags":[],"class_list":["post-18674","post","type-post","status-publish","format-standard","hentry","category-bid-opportunities-closed"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/18674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18674"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/18674\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}