{"id":3079,"date":"2015-07-28T10:38:22","date_gmt":"2015-07-28T14:38:22","guid":{"rendered":"http:\/\/www.bgjwsc.org\/?p=3079"},"modified":"2015-07-28T10:38:22","modified_gmt":"2015-07-28T14:38:22","slug":"public-meeting-notice-master-plan-update-august-5th-2015","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=3079","title":{"rendered":"Public Meeting Notice &#8211; Master Plan Update &#8211; August 5th, 2015"},"content":{"rendered":"<p style=\"text-align: center;\"><strong><u>PUBLIC MEETING NOTICE<\/u><\/strong><\/p>\n<p style=\"text-align: center;\"><strong>THE BRUNSWICK-GLYNN COUNTY JOINT WATER &amp; SEWER COMMISSION<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>SYSTEMS MASTER PLAN UPDATE &amp; PRELIMINARY DRAFT REVIEW<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>PRESENTED BY:\u00a0 APPLIED TECHNOLOGY &amp; MANAGEMENT. INC.\u00a0 &amp; JWSC<\/p>\n<p>DATE:\u00a0 August 5<sup>th<\/sup>, 2015<\/p>\n<p>TIME:\u00a0 10:00 AM to 3:00 PM<\/p>\n<p>LOCATION:\u00a0 1703 Gloucester Street, Commission Conference Chamber<\/p>\n<p>The Brunswick \u2013 Glynn County Joint Water &amp; Sewer Commission will be hosting a public meeting on August 5<sup>th<\/sup>, at 10:00 AM to present and discuss the JWSC Systems Master Plan Update.\u00a0 The original master plan was completed in 2007 and has not been updated since. A Master Plan should be updated every 5 years. This presentation will define what condition the JWSC water and sanitary sewer systems are currently in and a proposed plan for needed repair &amp; replacement for these systems.\u00a0 It will also define where current capital improvement projects are needed.<\/p>\n<p>This presentation is important to the water and sewer infrastructure and is to formulate a short and long range blueprint on maintaining these complex systems.\u00a0 The proposed master plan will also set up a funding path to manage long range budgets by.<\/p>\n<p>This meeting will present the first preliminary draft of this update.\u00a0 Commission, Staff, and Public input are encouraged during this meeting.\u00a0 The final draft will be made available approximately 30 days after this presentation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PUBLIC MEETING NOTICE THE BRUNSWICK-GLYNN COUNTY JOINT WATER &amp; SEWER COMMISSION SYSTEMS MASTER PLAN UPDATE &amp; PRELIMINARY DRAFT REVIEW &nbsp; PRESENTED BY:\u00a0 APPLIED TECHNOLOGY &amp; MANAGEMENT. INC.\u00a0 &amp; JWSC DATE:\u00a0 August 5th, 2015 TIME:\u00a0 10:00 AM to 3:00 PM LOCATION:\u00a0 1703 Gloucester Street, Commission Conference Chamber The Brunswick \u2013 Glynn County Joint Water &amp; Sewer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[7],"tags":[],"class_list":["post-3079","post","type-post","status-publish","format-standard","hentry","category-town-hall-meeting-notifications"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/3079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3079"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/3079\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}