{"id":33746,"date":"2022-05-26T11:10:35","date_gmt":"2022-05-26T15:10:35","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=33746"},"modified":"2022-05-26T11:10:35","modified_gmt":"2022-05-26T15:10:35","slug":"project-info-north-mainland-north-mainland-water-loops","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=33746","title":{"rendered":"Project Info &#8211; North Mainland &#8211; North Mainland Water Loops"},"content":{"rendered":"<ul>\n<li>\n<ul>\n<li><strong>Project Number:<\/strong><\/li>\n<li><strong>District and General Location: <\/strong>North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway.<\/li>\n<li><strong>Total Budget:<\/strong> $2.M<\/li>\n<li><strong>Anticipated Construction Completion Date:<\/strong> Summer 2023<\/li>\n<li><strong>Details:<\/strong> The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland District via open-cut and trenchless methods.<\/li>\n<li><strong>Purpose: <\/strong>The purpose of the project is to eliminate dead ends where water can become stagnant from lack of use, and improve water quality, and fire protection for JWSC customers.<\/li>\n<li><strong>Have More Questions?<\/strong> Please Contact W. Todd Kline, P.E., Director of Engineering by email here: <a style=\"font-size: 1rem;\" href=\"mailto:dsimmons@bgjwsc.org\">tkline@bgjwsc.org<\/a><\/li>\n<\/ul>\n<h2>Visual Summary:<\/h2>\n<p><a style=\"font-size: 1rem;\" href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide10.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-33747 size-full\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide10.jpg\" alt=\"\" width=\"816\" height=\"532\" \/><\/a><\/li>\n<\/ul>\n<h2>Monthly Active Construction Project Photo Report(s):<\/h2>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2023-NOVEMBER-NORTH-MAINLAND-WATER-LOOPS.pdf\">2023 NOVEMBER NORTH MAINLAND WATER LOOPS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2023-DECEMBER-NORTH-MAINLAND-WATER-LOOPS-1.pdf\">2023 DECEMBER NORTH MAINLAND WATER LOOPS (1)<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2023-DECEMBER-NORTH-MAINLAND-WATER-LOOPS-2.pdf\">2023 DECEMBER NORTH MAINLAND WATER LOOPS (2)<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-JANUARY-NORTH-MAINLAND-WATER-LOOPS.pdf\">2024 JANUARY NORTH MAINLAND WATER LOOPS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-JANUARY-NORTH-MAINLAND-WATER-LOOPS2.pdf\">2024 JANUARY NORTH MAINLAND WATER LOOPS(2)<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-FEBRUARY-NORTH-MAINLAND-WATER-LOOPS.pdf\">2024 FEBRUARY NORTH MAINLAND WATER LOOPS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-FEBRUARY-NORTH-MAINLAND-WATER-LOOPS-2.pdf\">2024 FEBRUARY NORTH MAINLAND WATER LOOPS (2)<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-APRIL-NORTH-MAINLAND-WATER-LOOPS.pdf\">2024 APRIL NORTH MAINLAND WATER LOOPS<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Number: District and General Location: North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway. Total Budget: $2.M Anticipated Construction Completion Date: Summer 2023 Details: The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[28],"tags":[],"class_list":["post-33746","post","type-post","status-publish","format-standard","hentry","category-previous-project-updates"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33746"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33746\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}