{"id":33785,"date":"2022-05-26T15:40:53","date_gmt":"2022-05-26T19:40:53","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=33785"},"modified":"2022-05-26T15:40:53","modified_gmt":"2022-05-26T19:40:53","slug":"project-info-north-mainland-wpcf-land-acquisition-and-engineering","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=33785","title":{"rendered":"Project Info &#8211; North Mainland WPCF Land Acquisition and Engineering"},"content":{"rendered":"<ul>\n<li>\n<ul>\n<li><strong>Project Number:<\/strong><\/li>\n<li><strong>District and General Location: <\/strong>Located in the North Mainland District<\/li>\n<li><strong>Total Budget:<\/strong> $TBD<\/li>\n<li><strong>Anticipated Construction Completion Date:<\/strong> TBD<\/li>\n<li><strong>Details:<\/strong> The project consists of purchasing the property and plant engineering design to meet future infrastructure and system needs.<\/li>\n<li><strong>Purpose: <\/strong>The purpose of the project is to secure a future public wastewater treatment plant site to serve the North Mainland District residents on the public sewer system.<\/li>\n<li><strong>Have More Questions?<\/strong> Please Contact Andrew Burroughs, P.E., Executive Director by email here: <a style=\"font-size: 1rem;\" href=\"mailto:aburroughs@bgjwsc.org\">aburroughs@bgjwsc.org<\/a><\/li>\n<\/ul>\n<h2>Visual Summary:<\/h2>\n<p><a style=\"font-size: 1rem;\" href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide20.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-33786 size-full\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide20.jpg\" alt=\"\" width=\"816\" height=\"532\" \/><\/a><\/li>\n<\/ul>\n<h2>Monthly Active Construction Project Photo Report(s):<\/h2>\n","protected":false},"excerpt":{"rendered":"<p>Project Number: District and General Location: Located in the North Mainland District Total Budget: $TBD Anticipated Construction Completion Date: TBD Details: The project consists of purchasing the property and plant engineering design to meet future infrastructure and system needs. Purpose: The purpose of the project is to secure a future public wastewater treatment plant site [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[38],"tags":[],"class_list":["post-33785","post","type-post","status-publish","format-standard","hentry","category-current-project-updates"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33785"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33785\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}