{"id":33788,"date":"2022-05-26T15:47:45","date_gmt":"2022-05-26T19:47:45","guid":{"rendered":""},"modified":"2022-05-26T15:47:45","modified_gmt":"2022-05-26T19:47:45","slug":"project-info-ssi-ocean-boulevard-water-improvements","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=33788","title":{"rendered":"Project Info &#8211; SSI &#8211; Ocean Boulevard Water Improvements"},"content":{"rendered":"<ul>\n<li>\n<ul>\n<li><strong>Project Number:<\/strong><\/li>\n<li><strong>District and General Location:<\/strong> Saint Simons Island District along Ocean Boulevard<\/li>\n<li><strong>Total Budget:<\/strong> $1.75M<\/li>\n<li><strong>Anticipated Construction Completion Date:<\/strong> TBD<\/li>\n<li><strong>Details:<\/strong> The project consists of replacing the existing watermain from East Beach to the Village on Saint Simons Island.<\/li>\n<li><strong><strong>Purpose: <\/strong><\/strong>The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the consequence of a failure to the service area (i.e., size of community impact). Those areas with the greatest need where repairs would have the greatest impact are where JWSC focuses the efforts.<\/li>\n<li><strong>Have More Questions?<\/strong> Please Contact W. Todd Kline, P.E., Director of Engineering by email here: <a style=\"font-size: 1rem;\" href=\"mailto:tkline@bgjwsc.org\">tkline@bgjwsc.org<\/a><\/li>\n<\/ul>\n<h2>Visual Summary:<\/h2>\n<p><a style=\"font-size: 1rem;\" href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide21.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-33789 size-full\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide21.jpg\" alt=\"\" width=\"816\" height=\"532\" \/><\/a><\/li>\n<\/ul>\n<h2>Monthly Active Construction Project Photo Report(s):<\/h2>\n","protected":false},"excerpt":{"rendered":"<p>Project Number: District and General Location: Saint Simons Island District along Ocean Boulevard Total Budget: $1.75M Anticipated Construction Completion Date: TBD Details: The project consists of replacing the existing watermain from East Beach to the Village on Saint Simons Island. Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[38],"tags":[],"class_list":["post-33788","post","type-post","status-publish","format-standard","hentry","category-current-project-updates"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33788","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33788"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33788\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33788"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33788"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33788"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}