{"id":33791,"date":"2022-05-26T15:55:02","date_gmt":"2022-05-26T19:55:02","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=33791"},"modified":"2022-05-26T15:55:02","modified_gmt":"2022-05-26T19:55:02","slug":"project-info-ssi-wesley-oak-circle-watermain-improvements","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=33791","title":{"rendered":"Project Info &#8211; SSI &#8211; Wesley Oak Circle Watermain Improvements"},"content":{"rendered":"<ul>\n<li>\n<ul>\n<li><strong>Project Number:<\/strong><\/li>\n<li><strong>District and General Location: <\/strong>Saint Simons Island District in the Westley Oak Neighborhood Subdivision<\/li>\n<li><strong>Total Budget:<\/strong> $450K<\/li>\n<li><strong>Anticipated Construction Completion Date:<\/strong> TBD<\/li>\n<li><strong>Details:<\/strong> The project consists of replacing the 2-inch galvanized watermain loop with 6-inch and 8-inch sections.<\/li>\n<li><strong><strong>Purpose: <\/strong><\/strong>The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the consequence of a failure to the service area (i.e., size of community impact). Those areas with the greatest need where repairs would have the greatest impact are where JWSC focuses the efforts.<\/li>\n<li><strong>Have More Questions?<\/strong> Please Contact Derrick Simmons, Water Distribution Superintendent<br \/>\n<a href=\"mailto:dsimmons@bgjwsc.org\">dsimmons@bgjwsc.org<\/a><\/li>\n<\/ul>\n<h2>Visual Summary:<\/h2>\n<p><a style=\"font-size: 1rem;\" href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide22.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-33792 size-full\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/Slide22.jpg\" alt=\"\" width=\"816\" height=\"532\" \/><\/a><\/li>\n<\/ul>\n<h2>Monthly Active Construction Project Photo Report(s):<\/h2>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-APRIL-WESLEY-OAKS-CIRCLE-WATERMAIN-IMPROVEMENTS.pdf\">2024 APRIL WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-MAY-WESLEY-OAKS-CIRCLE-WATERMAIN-IMPROVEMENTS.pdf\">2024 MAY WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-JUNE-WESLEY-OAKS-CIRCLE-WATERMAIN-IMPROVEMENTS.pdf\">2024 JUNE WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-JULY-WESLEY-OAKS-CIRCLE-WATERMAIN-IMPROVEMENTS.pdf\">2024 JULY WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2022\/05\/2024-August-WESLEY-OAKS-CIRCLE-WATERMAIN-IMPROVEMENTS.pdf\">2024 August WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Number: District and General Location: Saint Simons Island District in the Westley Oak Neighborhood Subdivision Total Budget: $450K Anticipated Construction Completion Date: TBD Details: The project consists of replacing the 2-inch galvanized watermain loop with 6-inch and 8-inch sections. Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[38],"tags":[],"class_list":["post-33791","post","type-post","status-publish","format-standard","hentry","category-current-project-updates"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33791"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/33791\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}