{"id":4077,"date":"2016-02-12T15:03:14","date_gmt":"2016-02-12T20:03:14","guid":{"rendered":"http:\/\/www.bgjwsc.org\/?p=4077"},"modified":"2016-02-12T15:03:14","modified_gmt":"2016-02-12T20:03:14","slug":"facilities-committee-minutes-january-14-2016","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=4077","title":{"rendered":"Facilities Committee Minutes \u2013 January 14, 2016"},"content":{"rendered":"<p>For your consideration, please review the minutes for the Facilities Committee Meeting from\u00a0January 14, 2016:<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/02\/BGJWSC__Facilities_Committee_Minutes_January_14_2016.pdf\" rel=\"\">BGJWSC__Facilities_Committee_Minutes_January_14,_2016<\/a><\/p>\n<p>To read the minutes, please open or download the pdf from the link above or you may see more below:<!--more--><\/p>\n<p><strong>PRESENT<\/strong>:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ronnie Perry, Chairman<\/p>\n<p>Clifford Adams, Commissioner<\/p>\n<p>Robert Bowen, Commissioner<\/p>\n<p>Todd Kline, Senior Engineer<\/p>\n<p>Steve Swan, Executive Director<\/p>\n<p><strong>ALSO PRESENT<\/strong>:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Thomas Boland, Commissioner<\/p>\n<p>Chairman Perry called the meeting to order at 3:00 PM.<\/p>\n<p><strong>PUBLIC COMMENT PERIOD<\/strong><\/p>\n<p>There being no citizens who wished to address the Commission, Chairman Perry closed the Public Comment Period.<\/p>\n<p><strong>ADOPT:<\/strong><\/p>\n<p><strong>Minutes from December 10, 2015 Facilities Committee Meeting<\/strong><\/p>\n<p><u>Commissioner Adams made a motion seconded by Commissioner Bowen to adopt the minutes of the December 10, 2015 Facilities Committee Meeting. Motion carried 3-0-0<\/u>.<\/p>\n<p><strong>DISCUSSION:<\/strong><\/p>\n<p><strong>Academy Creek Immediate Repairs to Load Plate Brackets \u2013 S. Swan<\/strong><\/p>\n<p>Steve Swan updated the committee on the present condition of the Academy Creek building requiring immediate repair.\u00a0\u00a0 This is the Systems Pumping and Maintenance facilities.\u00a0 He provided details and a slide presentation showing the 68 decayed brackets securing the building structure.\u00a0 The staff is waiting on budget numbers and drawings from the contractor.\u00a0 The pictures indicate concrete and caulking erosion.<\/p>\n<p><strong>Commercial Sellers Listing Agreement on JWSC Properties \u2013 P. Crosby<\/strong><\/p>\n<p>Pam Crosby updated the Commissioners on the property marketing summary and timeline provided by Driggers Realty. The committee also had the property listing and agreement in hand to review will expire in March.\u00a0 There was discussion of possible reduction of listing price by 10% and the current agreement.\u00a0 The committee recommended to place an RFP together and place the listing out for proposal \/ BID.\u00a0 It was noted that JWSC is not bound to stay with the appraised value price.<\/p>\n<p><strong>Update on Lift Station 2032 &amp; Proposed Regional Fire Well<\/strong> \u2013 S. Swan<\/p>\n<p>Steve Swan provided an update on the 2032 Lift Station. The map discussed the area which included of Sea Palms West.\u00a0 The streets have been inspected and the pictures showed where there have been many I &amp; I problems (which have been reduced).\u00a0 JWSC has updated the horsepower from 220 to 247 pumps.\u00a0 Mr. Swan shared pictures of just 20 % of what was found at Sea Palms West which included: clear water (I&amp;I problem), corrosion, gaskets exposed, broken pipes, and disconnected lines.\u00a0 Systems Pumping and Maintenance crew are working hard to fix with point repairs and many lines will eventually need to be replaced.\u00a0 Inspectors are vital and needed to make assessment on the lines.\u00a0 It was noted there are currently 42 projects being worked on.\u00a0\u00a0 Ms. Swan addressed South and North Harrington development areas noting there are 257 possible homes being planned.\u00a0 Gravity lines were proposed for the area to include Glynn County Park and behind it.\u00a0 Currently 2032 is controlling all the waste from the north end of the island to an 8\u201d line to the Dunbar Creek WWTF with no gravity tap on Frederica.\u00a0\u00a0 This poses a problem with capacity with the expected development.\u00a0 The plan is to take a list station and provide a gravity line.\u00a0 Additional development in the area that needs sewer were discussed.\u00a0 The gravity sewer proposed would eliminate 7 lift stations.\u00a0 There have been many involved in this plan.\u00a0 The lift station will be big enough to have a 14\u201d directional bored force main dedicated to the north end of the Island.\u00a0 ATM is currently working on the pricing to show the cost savings.<\/p>\n<p><strong>Proposed Abandonment of 6\u201d Hampton Plantation Fire Well<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan updated the committee on the North Hampton Plantation Water Production Facility by contractor Southern Champion. Sapp well drilling has provide rehabilitation of the well.\u00a0 Within 30 days it will be up and running.\u00a0 This fire well started pumping sand about a year ago and damages the motor and burns it up.\u00a0 Information was provided showing GIS maps.\u00a0 Various items like the eye wash safety features and chlorine closet can be used at another facility.\u00a0 The staff suggest getting an appraisal value and selling to the golf course or decommission it and cap the well.<\/p>\n<p><strong>Property Designation for SSI Airport Well and Water Production Plant<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan discussed the SSI airport well and water production plant. It was noted that this is one of the properties that has not been designated to JWSC.\u00a0 A map was shared for the committee and noted that a survey was provided by Shupe Design.\u00a0\u00a0 There are two ground storage tanks and a well across the road.<\/p>\n<p><strong>Property Reallocation of SPLOST 5 Funds for Atlantic\/Holly Street Sewer Line Rehabilitation Project <\/strong>\u2013 S. Swan<\/p>\n<p>Ms. Swan updated the committee on the sewer rehabilitation that will provide current residents with aging septic systems and low pressure grinders pumps with a more efficient way of treating waste water.\u00a0\u00a0 The sewer improvements include installation of approx. 3,100 linear feet of 8\u201d and 10\u201d gravity sewer lines with service provisions along Holly St., Maple St., and Second Ave. on St. Simons Island.\u00a0 The gaining street would be Atlantic.\u00a0 The connection with the sewer to the public sewer line with proposed work would include full road paving and replacement.\u00a0 This project would be good to co-ordinate with the county to avoid tearing the street up at one time.\u00a0\u00a0 The SPLOST 5 items were discussed as approving of rehabilitation of sewer lines in unincorporated Glynn County as needed.\u00a0 It was designated for the Atlantic project but was not allowed for the project.\u00a0\u00a0 There is currently 561k designated for this budgeted item.\u00a0 Commissioner Bowen discussed additional items regarding this SPLOST item.<\/p>\n<p><strong>Proposed Reallocation of SPLOST 5 Funds for Mainland WWTF<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan discussed the SPLOST item named as Site Permit and Design Mainland Waste Water Treatment Plant. This item explains planning and working with JWSC for the site which has allocated 1.5M budgeted.\u00a0 There have been receipts from ATM and Brown and Caldwell for permitting which was paid by JWSC.\u00a0 There are three sites that are permitted and approved by the EPD and there is criteria on which we are to pursue.\u00a0 The North Mainland WWTF showing Academy Creek which is running at 44%.\u00a0 If the I &amp; I problems are corrected if could be down to 33% and there should be no need for an additional plant.\u00a0 By the budget remains from the county as of 10\/31\/15 there was 1.4M left in the account and it is recommended to re-designate and use towards sewer projects. This facility can be maintained cheaper and service the public.\u00a0 There are several recommendation in the proposed master plan of things that are in serious or critical condition that need to be addressed right away.<\/p>\n<p><strong>SPLOST 5 Water Line Rehabilitation Project Alder Circle<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan discussed with the committee on the water line rehabilitation. Under and agreement with Glynn County and JWSC is to survey and engineer to replace a 2\u201d fire line in Sea Palms East on Alder Circle.\u00a0 This 2\u201d lines provides fire protection and supplies water to the houses.\u00a0 The money allotted for this project is 178K and should be drawn up in the next two weeks. There is not enough pressure on the line if a house should catch fire.\u00a0 The map showing the area was discussed.<\/p>\n<p><strong>Final Draft Master Plan Workshop (January 28<sup>th<\/sup>, 2016)<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan updated the committee on the plan for staff to meet with 4 Waters. The 10 most critical lift stations will be identifying.\u00a0 He explained that several items will be changing like 2030 that will be complete soon and 2039 that was completed mostly by in house and upgraded.\u00a0\u00a0 The master plan will go out electronic after the review and update with 4 Waters and staff.<\/p>\n<p><strong>Tradewinds<\/strong> \u2013 S. Swan<\/p>\n<p>Mr. Swan updated the committee on the Tradewinds area off exit 42\/HWY 99 near the rest stop on Interstate 95. A meeting is planned with the developers for this project. They have proposed to help fund or solely fund with a payback system on placing a water pumping system facility with an elevated water tank.\u00a0 There is a 12\u201d water line but does not provide adequate pressure to suffice overhead fire protection. There was discussion on the donation of the land and the easement and a logo to be placed on the water tank.<\/p>\n<p><strong>Director\u2019s Update<\/strong><\/p>\n<p>Meeting was adjourned at 4:13 pm.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For your consideration, please review the minutes for the Facilities Committee Meeting from\u00a0January 14, 2016: BGJWSC__Facilities_Committee_Minutes_January_14,_2016 To read the minutes, please open or download the pdf from the link above or you may see more below:<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[20],"tags":[],"class_list":["post-4077","post","type-post","status-publish","format-standard","hentry","category-facilities-committee-minutes"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4077"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4077\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}