{"id":4103,"date":"2016-02-24T16:53:23","date_gmt":"2016-02-24T21:53:23","guid":{"rendered":"http:\/\/www.bgjwsc.org\/?p=4103"},"modified":"2016-02-24T16:53:23","modified_gmt":"2016-02-24T21:53:23","slug":"public-meeting-notice-master-plan-update-march-3-2016","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=4103","title":{"rendered":"Public Meeting Notice &#8211; Master Plan Update &#8211; March 3, 2016"},"content":{"rendered":"<p style=\"text-align: center;\"><span style=\"text-decoration: underline;\">PUBLIC MEETING NOTICE<\/span><br \/>\nTHE BRUNSWICK-GLYNN COUNTY JOINT WATER &amp; SEWER COMMISSION<br \/>\nSYSTEMS MASTER PLAN REVIEW<\/p>\n<p>Master Plan Update<br \/>\nMarch 3rd, 2016<\/p>\n<p>PRESENTED BY: FOUR WATERS ENGINEERING, INC., APPLIED TECHNOLOGY &amp;<br \/>\nMANAGEMENT INC. &amp; BGJWSC<\/p>\n<p>DATE: March 3rd, 2016<\/p>\n<p>TIME: 1:00 PM to 4:00 PM<\/p>\n<p>LOCATION: 1703 Gloucester Street, Commission Conference Chamber<\/p>\n<p>The Brunswick \u2013 Glynn County Joint Water &amp; Sewer Commission will be hosting a public meeting on March 3rd 2016 at 1 PM to present and discuss the BGJWSC Systems Master Plan Update. The original master plan was completed in 2009. A Master Plan should be updated every 5 years to account for changing priorities, completed projects, and to update the impact of development and the need for growth and expansion of the water and sewer systems. This presentation will define both rehabilitation capital improvements to provide a proposed plan for needed repair &amp; replacement and expansion capital improvements to address necessary upgrades, extensions, or capacity increases for anticipated development.<\/p>\n<p>This presentation is important to the water and sewer infrastructure and is to formulate a short and long range blueprint on maintaining these complex systems. The proposed master plan will also set up a funding path to manage long range budgets by.<\/p>\n<p>The Commission, staff, and public input are encouraged during this meeting.<\/p>\n<p>Updated 3\/1\/16 &#8211; The draft of the Master Plan being considered for acceptance by the BGJWSC is attached, along with a quick reference guide:<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/02\/BGJWSC_2015_Master_Plan_Update_-_Final_-_Feb_2016_R2.pdf\" rel=\"\">BGJWSC_2015_Master_Plan_Update_-_Final_-_Feb_2016_R2<\/a><\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/02\/BGJWSC_Quick_Regional_Reference_Guide.pdf\" rel=\"\">BGJWSC_Quick_Regional_Reference_Guide<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PUBLIC MEETING NOTICE THE BRUNSWICK-GLYNN COUNTY JOINT WATER &amp; SEWER COMMISSION SYSTEMS MASTER PLAN REVIEW Master Plan Update March 3rd, 2016 PRESENTED BY: FOUR WATERS ENGINEERING, INC., APPLIED TECHNOLOGY &amp; MANAGEMENT INC. &amp; BGJWSC DATE: March 3rd, 2016 TIME: 1:00 PM to 4:00 PM LOCATION: 1703 Gloucester Street, Commission Conference Chamber The Brunswick \u2013 Glynn [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[7],"tags":[],"class_list":["post-4103","post","type-post","status-publish","format-standard","hentry","category-town-hall-meeting-notifications"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4103"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4103\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}