{"id":4287,"date":"2016-04-15T16:40:15","date_gmt":"2016-04-15T20:40:15","guid":{"rendered":"http:\/\/www.bgjwsc.org\/?p=4287"},"modified":"2016-04-15T16:40:15","modified_gmt":"2016-04-15T20:40:15","slug":"facilities-committee-minutes-february-11-2016","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=4287","title":{"rendered":"Facilities Committee Minutes \u2013 February 11, 2016"},"content":{"rendered":"<p>For your consideration, please review the minutes for the Facilities Committee Meeting from\u00a0February 11, 2016:<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/04\/BGJWSC_Facilities_Committee_Minutes_February_11_2016.pdf\">BGJWSC_Facilities_Committee_Minutes_February_11,_2016<\/a><\/p>\n<p>To read the minutes, please open or download the pdf from the link above or you may see more below: <!--more--><\/p>\n<p><strong>PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p>Clifford Adams, Commissioner<\/p>\n<p>Robert Bowen, Commissioner<\/p>\n<p>Todd Kline, Senior Engineer<\/p>\n<p>Donald Elliot, Commissioner<\/p>\n<p>Thomas Boland, Commissioner<\/p>\n<p><strong>ABSENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p>Ronald Perry, Commissioner<\/p>\n<p><strong>ALSO PRESENT: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p>John Donaghy, Director of Finance &amp; Administration<\/p>\n<p>Pam Crosby, Purchasing Director<\/p>\n<p>Kirk Young, Systems Pumping &amp; Maintenance<\/p>\n<p>Chairman Boland called the meeting to order at 3:00 PM.<\/p>\n<p><strong>PUBLIC COMMENT PERIOD<\/strong><\/p>\n<p>There being no citizens that wished to address the Committee, Todd Kline closed the Public Comment Period.<\/p>\n<p><strong>ADOPT:<\/strong><\/p>\n<p><strong>Minutes from January 14, 2016 Facilities Committee Meeting<\/strong><\/p>\n<p><u>Commissioner Adams made a motion seconded by Commissioner Elliott to adopt the minutes of the January 14, 2016 Facilities Committee Meeting. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p><strong>Canal Road Water &amp; Sewer Force Main Improvements Award<\/strong> \u2013 T. Kline<\/p>\n<p>Todd Kline updated the committee on the Canal Road Water &amp; Sewer Force Main Award. The memorandum explained the background and timeline.\u00a0 Mr. Kline noted the bid form component structures options.\u00a0 The bid consisted of a fifty-eight (58) contractor\/subcontractor\/ supplier mailing list and seven (7) plan holder services were notified by email.\u00a0 A mandatory pre-bid meeting was held on Thursday, January 21, 2015 and 18 contractors\/subcontractors\/suppliers were in attendance.\u00a0 There was a total of five (5) bids received from the following:\u00a0 Woodard Construction Company, Seaboard Construction, Rowell Contracting, Washington County Machine Shop, and Popco, Incorporated.\u00a0 The staff has reviewed the above options and recommends award of contract for this project to Woodard Construction Company in the amount of $1,045,382.00.\u00a0 There was further discussion regarding the project schedule for preconstruction.\u00a0 It was stated that the Water Main is priority to be completed by August 1<sup>st<\/sup> and the Sewer Force Main to be completed October 1, 2016.\u00a0 At each pay request the contractor is required to submit an updated project schedule.<\/p>\n<p><u>Commissioner Elliott made a motion seconded by Commissioner Boland to forward to the Finance Committee for review and to the full Commissioner for approval. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p><strong>Property &amp; Casual Insurance<\/strong> \u2013 Fred McGinty, McGinty-Gordon &amp; Associates<\/p>\n<p>Fred McGinty presented to the Committee a preliminary proposal. The two property proposal is down about 25% from last year.\u00a0 A professional appraisal was performed on all the properties and as a result there was a reduction in insured values by 9.7 million.\u00a0 Several buildings were considered obsolete. There is a lot of capacity for insurance and competitive pricing.\u00a0 Mr. McGinty discussed the handout and the differences in pricing.\u00a0 Terrorism coverage was discussed.\u00a0 The total insured property values are 86M and 3 buildings are valued at over 3M.\u00a0 The Administration building was discussed and valued at almost 5.2M.\u00a0 It was noted that the purchase of the building was about 800 thousand.\u00a0 Lloyds, Ace and Lexington Insurance prices were discussed.\u00a0 A recommended option is to accept the property proposals that you are comfortable with and the liability renewal with Trident and then give the Executive Director the authority and option to accept a better general liability bid if one is presented before March 15<sup>th<\/sup>. \u00a0\u00a0The recommendation is to go with ACE for the 10M property limit.<\/p>\n<p><u>Commissioner Boland made a motion seconded by Commissioner Bowen to go with the recommended property limit of 10M with ACE and move to the Finance Committee and full Commission. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p>Commissioner Boland discussed the Trident coverage and it was recommended to stay with Trident for the liability coverage. Travelers Insurance was discussed in regards to fraud.\u00a0 Faithful Performance was not part of Travelers package.\u00a0 Crime is a separate policy.\u00a0 Fred suggested leaving out the crime part of the trident package and if Travelers comes back and offers Faithful Performance we offer it to them.\u00a0 If not then we stay with Trident.\u00a0 Fred stated he will know more by the time the Finance Committee meets and can provide an updated.\u00a0 John Donaghy updated the committee on the administration building totals. The property was purchased at a little over 800K.\u00a0 At the time of purchase the property has a fair market value appraisal at 1.55M.\u00a0 With the cost of the building and improvements to the entire property of a final cost of 3.4M the property has an appraised value at 4.2M.\u00a0 This leaves BGJWSC right side up of $600 thousand dollars on this building.\u00a0 In addition, the property includes an income from renting CVS space and another parcel on the end.<\/p>\n<p><strong>Legal Services Renewal<\/strong><\/p>\n<p><u>Commissioner Adams made a motion seconded by Commissioner Boland to remove item 4 from the Facilities Committee agenda. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p><strong>PS2030 \/ Popco, Inc. Change Order \u2013 <\/strong>T. Kline<\/p>\n<p>Todd Kline discussed the Change orders for PS2030 Force Main &amp; Water Main Improvements; <em><u>Change Order for Water Main Installation<\/u><\/em> memorandum was read and explained.\u00a0 The staff has reviewed the options and found it is advantages and beneficial to the JWSC water to complete the work at this time.\u00a0 The pricing and plan provided by the Contractor is reasonable and consistent with other work and the time constraints placed on this portion of the project.\u00a0 This additional amount has been adjusted to include the directional bore of the water main instead of open cut.<\/p>\n<p><u>Commissioner Boland made a motion seconded by Commissioner Bowen to accept the proposal presented by Popco, Inc. and forward to the Finance Committee and then to the full Commission to install the water main on Sea Island Road in the manner described to be processed as a Contract Change Order for the additional amount of $197,536.00. Motion approved 3-0-1 (Commissioner Perry was absent for the vote). <\/u><\/p>\n<p><u><em>Change Order for Pump Station Control Panel Modification<\/em><\/u> memorandum was read and explained. Hydrogen Sulfide (H2S)\u00a0is a colorless gas with the characteristic foul odor of rotten eggs.\u00a0 This is a natural byproduct that is released when wastewater become turbulent.\u00a0 It is heavier than air, very poisonous, corrosive and flammable.\u00a0 Mr. Kline continued pumpstation control panels are typically sealed from atmospheric hydrogen sulfide.\u00a0 Typically the method for sealing this connection has been with \u201cduct seal\u201d putty sealants and problems occur where direct connections from wet well to control panel exist.\u00a0 A major portion of this project is the total replacement of the control panel for Pumpstation 2030.\u00a0 At the time of the project design, BGJWSC Construction Standards did not include cable junction boxes.\u00a0 These junction boxes would add another distinct layer of protection from wet well to control panel transfer.\u00a0 A secondary benefit is the ability to more quickly and safely change out of service the pumps and controls.\u00a0 The plan is to revise our standards and include these in all pumpstations going forward.\u00a0 Staff has reviewed and found it advantageous and beneficial to the longevity and reliability of the new Pumpstation 2030 control panel to complete the work at this time.\u00a0 Kirk Young added this process is a proven methodology used across the country to isolate the migration of the gases.\u00a0 It was stated that a master electrician can install this item.<\/p>\n<p><u>Commissioner Bowen made a motion seconded by Commissioner Elliott to accept the proposal presented by Popco, Inc. and forward to the Finance Committee and then to full Commission to install cable junction boxes in the manner described to be processed as a Contract Change Order for the additional amount of $28,188.00. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p><em><u>Change Order for Force Main Receiving Manhole Top Replacement<\/u><\/em> memorandum was read and explained. The new Pumpstation 2030 force main will discharge to an existing receiving manhole at the southern entrance to Dunbar Creek WWTP.\u00a0 The existing ring and cover have failed to the extent that SP&amp;M staff have temporarily shored the cover in place. \u00a0Mr. Kline stated this manhole is located approximately ten feet from the shoulder of Sea Island Rd and presents a distinct hazard to the traveling public and the personnel entering the WWTP.\u00a0 Repair of this manhole will require replacement of the entire precast top.\u00a0 The staff as reviewed and found it is advantageous and beneficial to have the Contractor replace the manhole top at this time while they are mobilized.\u00a0 The safety hazard alone warrants this action.<\/p>\n<p><u>Commissioner Bowen made a motion seconded by Commissioner Boland to accept the proposal presented by Popco, Inc. and forward to the Finance Committee and then to the full Commission to install a new pre-cast top in the manner described as a Contract Change for the additional amount of $9,620.00. Motion approved 3-0-1 (Commissioner Perry was absent for the vote).<\/u><\/p>\n<p><strong>Mansfield St. Sewer Replacement Change Order \u2013 <\/strong>T. Kline<\/p>\n<p>Todd Kline explained the project as a cooperative effort between the City of Brunswick and the Brunswick-Glynn Joint Water and Sewer Commission. The contract is between the City of Brunswick and J.H. Stone Construction.\u00a0 It was stated the BGJWSC will reimburse the City per an MOU previously set in place. The current scope of work for the sewer portion of the Mansfield Project extends to existing Pumpstation 4002 on Reynolds St.\u00a0 The memorandum states that upon demolition of the manhole adjacent to PS4002 it was discovered that the existing 15\u201d gravity sewer upstream to Monck St. is in severe need of replacement.\u00a0 Investigation from the SP&amp;M crews showed the sewer main to be constructed of cast iron rather than the typical materials more suited to convey wastewater (clay, coated ductile iron, PVC, etc.). Tuberculation over time and the corrosive effects of the wastewater has resulted in the reduction of the inside diameter of the pipe causing compromising structural instability of the main.\u00a0 The Contractor provided a proposal to replace this 330 ft. of gravity main showing on the map.\u00a0 The change order was signed\/approved by Mr. Swan (Exec. Director at that time) and processed by the City per the contract document.\u00a0 Once the Contractor remobilized to perform the work it was discovered that the 16\u201d force main from PS4002 did not follow the route as shown in BGJWSC records.\u00a0 The force main\u2019s actual location is within 5\u2019 or less of the gravity main along the entire route.\u00a0 In order to replace the gravity main, this section of force main will also require relocation.\u00a0 The staff has reviewed the options and found it to be advantageous and beneficial to have the Contractor replace the failing 15\u201d gravity main at this time while they are mobilized.\u00a0 The map showing the sewer main and sewer force main was discussed.\u00a0 BGJWSC will be bearing the full cost of the repairs on Reynolds Sewer Replacements due to this is all sewer repairs.\u00a0 The other work being performed will be shared with the City for storm drainage repairs.<br \/>\n<u><\/u><\/p>\n<p><u>Commissioner Bowen made a motion seconded by Boland to accept both proposals presented by J.H. Stone, Inc. and forward to the Finance Committee and then to full Commission to be processed as Contract Change Orders for the total additional amount of $160,924,42. Motion approved 3-0-1 (Commissioner Perry was absent for the vote). <\/u><\/p>\n<p><strong>\u00a0<\/strong><strong>DISCUSSION:<\/strong><\/p>\n<p><strong>Elevated tank Inspection Update \u2013 <\/strong>Ed Chapman<\/p>\n<p><strong>Billy Simons introduced Ed Chapman, an independent inspector.<\/strong>\u00a0 BGJWSC contracted with Mr. Chapman to be our third party inspector for our elevated storage tank when discrepancies were found on work that was being done.\u00a0 He is also working on washouts and inspections of ground storage tanks.\u00a0 Mr. Chapman stated he is an engineer and routinely checks water tanks.\u00a0 There were several issues found on the current services.\u00a0 It was recommended to continue pressing the issue to complete the work that was originally expected since this work was previously paid for.\u00a0 Mr. Chapman discussed water tank maintenance and quality control.\u00a0 He recommended to have a third party inspector on all work done especially if there is a contract.\u00a0 Tank maintenance companies typically use a coating called Tnemec brand paint is used on 99% on all water tanks.\u00a0 The 73 Series paint usually provides a 10 year life.\u00a0 If BGJWSC chooses not to have a maintenance contract, the work being performed now will last approx. 5 years.\u00a0 At that time the water company could contract the work out when needed.\u00a0 Maintenance programs usually run 20 years and should provide a wash out every 2 years and paint every 10 years.\u00a0 It was discussed that there are approx. 10 elevated tanks.\u00a0 Mr. Chapman stated the tanks are in fairly good shape.\u00a0 It was stated that the current contract holder, Utilities Service, has been notified of termination of the contract and the plan to set up for an RFP when contract is up on August 1<sup>st, <\/sup>which they can also place a bid.\u00a0 Pam Crosby stated next we plan to have a tank contractor present the pros and cons to have a contract.\u00a0\u00a0 In April the RFP will be presented and it should be a requirement to evaluate each\/all tanks and what the contractor would do to rectify.\u00a0 Doing this will help to measure work.<\/p>\n<p><strong>\u00a0<\/strong><strong>Property Marketing Update \u2013<\/strong> P. Crosby<\/p>\n<p>Pam Crosby updated the committee on the marketing summary on 1709 Gloucester. This is the proposed rental space.\u00a0 Driggers Realty provided a report and it was discussed on the activity. The inside build-out was discussed that the renter will pay for this expense.\u00a0 It was noted that the picture needs to be updated to show the new windows and construction and the signage is not visible from the street.\u00a0 These items were requested that the realtor update.<\/p>\n<p><strong>R &amp; R Funding Update <\/strong>\u2013 T. Kline<\/p>\n<p>Todd Kline and John Donaghy discussed the Repair and Replacement projects. The spreadsheet provided the estimated costs and there was discussed on the future project lists.\u00a0 These projects usually stay on the list until fiscal year end.\u00a0 The implementation of Cityworks\/Innoprise will help divide completed projects to those still being worked on. \u00a0The numbered projects were discussed.\u00a0 Epworth Acres were noted as needing a way to be funded that\u2019s not part of the projects.\u00a0 There are no expansion dollars devoted to it at this time.\u00a0 The same issue with Rose Dr. and Arco area.\u00a0 The tap fees were discussed for those getting off of septic. John stated these projects are substantial investments to the infrastructure and the need to develop ways to become a financial conduit for those areas in order to not tie up funds.<\/p>\n<p><strong>Flow Meters Update<\/strong> \u2013 K. Young &amp; T. Kline<\/p>\n<p>Todd Kline stated the Flow Meters are for the pumpstations. Kirk Young addressed the Committee and updated them on the Flow Meters received and on order. These are part of the EPD corrective action plan requirement.\u00a0 The costs are approx. 90K for an estimated 6 year installment to the 160 lift stations. It was stated that the staff has created an installment process and have begun at the 2032 basin.\u00a0 Mag meters are very accurate but need to be full in order to read accurately.\u00a0 Kirk stated it would be in our best interest to place this project out for an RFP as JWSC does not have the staff to install the required 25 per year to be within the EPD requirement.\u00a0 The other pumpstations earmarked for installment are 4039 and 4010.\u00a0 The data obtained from these Flow Meters are very important to provide cooperation with other pump stations and collected via SCADA.<\/p>\n<p><strong>A<\/strong><strong>cademy Creek Former DAF Facility Remediation Proposal Review<\/strong> \u2013 P. Crosby<\/p>\n<p>Pam Crosby presented to the Committee regarding the remediation for Academy Creek. Three remediation providers were contacted to diagnose the situation.\u00a0 Savannah Analytical &amp; Consulting Services (SACS) was used as a third party consulting service and provided a protocol plan.\u00a0 The staff invited both companies, Servpro or Brunswick and Paul Davis Emergency Services to provide presentations and details of project work.\u00a0 The DAF facility was noted to be the previous dewatering area where the sludge thickening tanks used were and is now empty but and kept locked.\u00a0 Pam stated there are plans to use this facility for storage, warehouse space, storm support or classrooms.\u00a0 Kirk explained the process to excavate the habitants without harming them.\u00a0 It was stated that the Paul Davis Company was most comprehensive and experienced.<\/p>\n<p><u>Commissioner Boland made a motion seconded by Commissioner Adams to forward to the Finance Committee then to the full Commission. <\/u><\/p>\n<p><strong>Director\u2019s Update<\/strong><\/p>\n<p>Meeting was adjourned at 4:06 pm.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For your consideration, please review the minutes for the Facilities Committee Meeting from\u00a0February 11, 2016: BGJWSC_Facilities_Committee_Minutes_February_11,_2016 To read the minutes, please open or download the pdf from the link above or you may see more below:<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[20],"tags":[],"class_list":["post-4287","post","type-post","status-publish","format-standard","hentry","category-facilities-committee-minutes"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4287"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4287\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}