{"id":4398,"date":"2016-05-13T16:56:52","date_gmt":"2016-05-13T20:56:52","guid":{"rendered":"http:\/\/www.bgjwsc.org\/?p=4398"},"modified":"2016-05-13T16:56:52","modified_gmt":"2016-05-13T20:56:52","slug":"request-for-proposal-to-provide-engineering-and-design-proposals-for-pumpstation-2032-regional-forcemain-improvements","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=4398","title":{"rendered":"Request For Proposal To Provide Engineering And Design Proposals For Pumpstation 2032 Regional Forcemain Improvements"},"content":{"rendered":"<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements.pdf\">Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements<\/a>\u00a0&#8211; Added 5\/13\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Pumpstation_2032_Survey_Boundary_Map.pdf\">Pumpstation_2032_Survey_Boundary_Map<\/a>\u00a0&#8211; Added 5\/13\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Pump_Station_2032_Survey_Drawings.pdf\">Pump_Station_2032_Survey_Drawings<\/a>\u00a0&#8211; Added 5\/17\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Addendum_No_1_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements.pdf\">Addendum_No_1_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements<\/a>\u00a0&#8211; Added 5\/25\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Addendum_No_2_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Re.pdf\">Addendum_No_2_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Re<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Addendum_No_2_-_Revised_Evaluation_Criteria_-_Section_6_0_002.pdf\">Addendum_No_2_-_Revised_Evaluation_Criteria_-_Section_6_0_(002)<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Final-Bid-Set_002.pdf\">Final-Bid-Set_(002)<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Pump_Station_2032_May_27_1983_002.pdf\">Pump_Station_2032_May_27_1983_(002)<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Pump_Station_2032_Rehab__Replacement_SSI_5_June_2001.pdf\">Pump_Station_2032_Rehab__Replacement_SSI_5_June_2001<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/sea_palms_health_and_racquet_club_18.pdf\">sea_palms_health_and_racquet_club_18<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/sea_palms_health_and_racquet_club_20.pdf\">sea_palms_health_and_racquet_club_20<\/a>\u00a0&#8211; Added 5\/31\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Addendum_No_3_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements.pdf\">Addendum_No_3_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements<\/a>\u00a0&#8211; Added 6\/1\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Pump_Station_2032_Base_Map_24x36.pdf\">Pump_Station_2032_Base_Map_24x36<\/a>\u00a0&#8211; Added 6\/1\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Proposal_Documents_Addendum_3_-_Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements.pdf\">Proposal_Documents_Addendum_3_-_Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements<\/a>\u00a0&#8211; Added 6\/1\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Tabulation_Sheet_-_RFP_To_Provide_Engeering_and_Design_Proposals_for_PS2032_Regional_Forcemain_Improvements.pdf\">Tabulation_Sheet_-_RFP_To_Provide_Engeering_and_Design_Proposals_for_PS2032_Regional_Forcemain_Improvements<\/a>\u00a0&#8211; Added 6\/8\/2016<\/p>\n<p><a href=\"http:\/\/www.bgjwsc.org\/wp-content\/uploads\/2016\/05\/Proposal-Award-Engineering_and_Design_Proposals_for_Pump_Station_2032_Regional_Force_Main_Improvements.pdf\">Proposal Award &#8211; Engineering_and_Design_Proposals_for_Pump_Station_2032_Regional_Force_Main_Improvements<\/a>\u00a0&#8211; Added 7\/20\/2016<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements\u00a0&#8211; Added 5\/13\/2016 Pumpstation_2032_Survey_Boundary_Map\u00a0&#8211; Added 5\/13\/2016 Pump_Station_2032_Survey_Drawings\u00a0&#8211; Added 5\/17\/2016 Addendum_No_1_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements\u00a0&#8211; Added 5\/25\/2016 Addendum_No_2_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Re\u00a0&#8211; Added 5\/31\/2016 Addendum_No_2_-_Revised_Evaluation_Criteria_-_Section_6_0_(002)\u00a0&#8211; Added 5\/31\/2016 Final-Bid-Set_(002)\u00a0&#8211; Added 5\/31\/2016 Pump_Station_2032_May_27_1983_(002)\u00a0&#8211; Added 5\/31\/2016 Pump_Station_2032_Rehab__Replacement_SSI_5_June_2001\u00a0&#8211; Added 5\/31\/2016 sea_palms_health_and_racquet_club_18\u00a0&#8211; Added 5\/31\/2016 sea_palms_health_and_racquet_club_20\u00a0&#8211; Added 5\/31\/2016 Addendum_No_3_-_Engineering_and_Design_Proposals_for_Pumpstation_2032_Regional_Forcemain_Improvements\u00a0&#8211; Added 6\/1\/2016 Pump_Station_2032_Base_Map_24x36\u00a0&#8211; Added 6\/1\/2016 Proposal_Documents_Addendum_3_-_Request_For_Proposal_To_Provide_Engineering_and_Design_Proposals_For_Pumpstation_2032_Regional_Forcemain_Improvements\u00a0&#8211; Added 6\/1\/2016 Tabulation_Sheet_-_RFP_To_Provide_Engeering_and_Design_Proposals_for_PS2032_Regional_Forcemain_Improvements\u00a0&#8211; Added 6\/8\/2016 Proposal Award &#8211; Engineering_and_Design_Proposals_for_Pump_Station_2032_Regional_Force_Main_Improvements\u00a0&#8211; Added 7\/20\/2016 &nbsp; &nbsp; &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[22],"tags":[],"class_list":["post-4398","post","type-post","status-publish","format-standard","hentry","category-bid-opportunities-closed"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4398"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/4398\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}