{"id":49328,"date":"2023-06-01T08:31:11","date_gmt":"2023-06-01T12:31:11","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=49328"},"modified":"2023-06-01T08:31:11","modified_gmt":"2023-06-01T12:31:11","slug":"invitation-to-bid-no-23-011-construction-services-for-north-mainland-water-loops-project-no-2103","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=49328","title":{"rendered":"Invitation to Bid No. 23-011 Construction Services for North Mainland Water Loops Project No. 2103"},"content":{"rendered":"<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/ITB-23-011-Construction-Services-for-North-Mainland-Water-Loops-JWSC-Project-No.-2103.pdf\">ITB 23-011 &#8211; Construction Services for North Mainland Water Loops &#8211; JWSC Project No. 2103<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL_Drawings_05-19-2023.pdf\">NMWL_Drawings_05-19-2023<\/a><\/strong><\/p>\n<p><strong> <a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL_Tech-Specs_05-19-2023.pdf\">NMWL_Tech Specs_05-19-2023<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-A-Geotechnical-Engineering-Investigation-Report.pdf\">NMWL Appendix A-Geotechnical Engineering Investigation Report<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-B-Underground-Utilities-Locating-Report.pdf\">NMWL Appendix B-Underground Utilities Locating Report<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-C-Georgia-EPD-Notice-of-Intent-Permit.pdf\">NMWL Appendix C-Georgia EPD, Notice of Intent Permit<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-D-Georgia-EPD-Drinking-Water-Permit.pdf\">NMWL Appendix D-Georgia EPD Drinking Water Permit<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-E-Georgia-DOT-Roadway-Encroachment-Application.pdf\">NMWL Appendix E-Georgia DOT Roadway Encroachment Application<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Appendix-F-US-Army-Corp-of-Engineers-Wetland-Encroachment-Letter.pdf\">NMWL Appendix F-US Army Corp of Engineers Wetland Encroachment Letter<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/ITB-No.-23-011-Water-Loops-Construction-Pre-Bid-Sign-Up.pdf\">ITB No. 23-011 Water Loops Construction Pre-Bid Sign Up<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/Addendum-1-ITB-No.-23-011-Water-Loops-Construction.pdf\">Addendum 1 &#8212; ITB No. 23-011 Water Loops Construction<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL_Addendum-1-Revised-Bid-Form.pdf\">NMWL_Addendum 1-Revised Bid Form<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/Addendum-2-ITB-No.-23-011-Water-Loops-Construction.pdf\">Addendum 2 &#8212; ITB No. 23-011 Water Loops Construction<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/Addendum-3-ITB-No.-23-011-Water-Loops-Construction.pdf\">Addendum 3 &#8212; ITB No. 23-011 Water Loops Construction<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/NMWL-Sheet-C-12-7-27-23.pdf\">NMWL Sheet C-12 7-27-23<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/Addendum-4-ITB-No.-23-011-Water-Loops-Construction.pdf\">Addendum 4 &#8212; ITB No. 23-011 Water Loops Construction<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/Addendum-5-ITB-No.-23-011-Water-Loops-Construction.pdf\">Addendum 5 &#8212; ITB No. 23-011 Water Loops Construction<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/ITB-no.-23-011-N-Mainland-Water-Loops-Bid-Attendance.pdf\">ITB no. 23-011 N Mainland Water Loops Bid Attendance<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/ITB-No.-23-011-N-Mainland-Water-Loops-Bids-Submitted.pdf\">ITB No. 23-011 N Mainland Water Loops Bids Submitted<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/06\/ITB-No.-23-011-Notice-of-Award-N-Mainland-Water-Loops.pdf\">ITB No. 23-011 Notice of Award &#8211; N Mainland Water Loops<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITB 23-011 &#8211; Construction Services for North Mainland Water Loops &#8211; JWSC Project No. 2103 NMWL_Drawings_05-19-2023 NMWL_Tech Specs_05-19-2023 NMWL Appendix A-Geotechnical Engineering Investigation Report NMWL Appendix B-Underground Utilities Locating Report NMWL Appendix C-Georgia EPD, Notice of Intent Permit NMWL Appendix D-Georgia EPD Drinking Water Permit NMWL Appendix E-Georgia DOT Roadway Encroachment Application NMWL Appendix F-US [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[22],"tags":[],"class_list":["post-49328","post","type-post","status-publish","format-standard","hentry","category-bid-opportunities-closed"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/49328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=49328"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/49328\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=49328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=49328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=49328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}