{"id":51702,"date":"2023-08-21T12:34:05","date_gmt":"2023-08-21T16:34:05","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=51702"},"modified":"2023-08-21T12:34:05","modified_gmt":"2023-08-21T16:34:05","slug":"hwy-341-crispen-blvd","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=51702","title":{"rendered":"HWY 341\/Crispen BLVD"},"content":{"rendered":"<ul>\n<li><strong>Project Number:<\/strong> #2215B<\/li>\n<li><strong>District and General Location: <\/strong>North Mainland District HWY 341 and Crispen BLVD Intersection<\/li>\n<li><strong>Total Budget:<\/strong> $700k<\/li>\n<li><strong>Anticipated Construction Completion Date:<\/strong> November 2023<\/li>\n<li><strong>Details:\u00a0<\/strong>The project consists of a sewer line repair that has corroded from the inside out, causing a sinkhole underneath the roadway. The anticipated start date will be following the Labor Day holiday.<\/li>\n<li><strong>Purpose:\u00a0<\/strong>The purpose of the project is to repair the failed sewer line and restore the roadway pavement.<\/li>\n<li><strong>Have More Questions?<\/strong>\u00a0 Please Contact W. Todd Kline, P.E., Director of Engineering by email here: <a href=\"mailto:tkline@bgjwsc.org\">tkline@bgjwsc.org<\/a><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-51706\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/08\/FAC-Project-Construction-Photos-August-2023-6-1.jpg\" alt=\"\" width=\"1455\" height=\"867\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-51707\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/08\/FAC-Project-Construction-Photos-August-2023-7.jpg\" alt=\"\" width=\"1463\" height=\"719\" \/><\/p>\n<h2>Monthly Active Construction Project Photo Report(s):<\/h2>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/08\/2023_September_HWY_341_Crispen.pdf\">2023_September_HWY_341_Crispen<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/08\/2023_October_HWY_341_Crispen.pdf\">2023_October_HWY_341_Crispen<\/a><\/p>\n<p><a href=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/08\/2023_November_HWY_341_Crispen.pdf\">2023_November_HWY_341_Crispen<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Number: #2215B District and General Location: North Mainland District HWY 341 and Crispen BLVD Intersection Total Budget: $700k Anticipated Construction Completion Date: November 2023 Details:\u00a0The project consists of a sewer line repair that has corroded from the inside out, causing a sinkhole underneath the roadway. The anticipated start date will be following the Labor [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[28],"tags":[],"class_list":["post-51702","post","type-post","status-publish","format-standard","hentry","category-previous-project-updates"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/51702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51702"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/51702\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}