{"id":54918,"date":"2023-11-15T11:03:35","date_gmt":"2023-11-15T16:03:35","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=54918"},"modified":"2023-11-15T11:03:35","modified_gmt":"2023-11-15T16:03:35","slug":"planned-water-outage-for-watermain-tie-ins-sections-of-the-arco-district-in-brunswick-thursday-november-16th-2023","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=54918","title":{"rendered":"Planned Water Outage for watermain tie-ins \u2013 Sections of the Arco District in Brunswick \u2013 Thursday, November 16th, 2023"},"content":{"rendered":"<p>In order for BGJWSC and contract staff to complete maintenance upgrades as part of the Arco project two water main tie-ins, water service will be intermittently unavailable or in low pressure from at or about 9:00 a.m. to 4:00 p.m. on Thursday, November 16th, 2023, for service connections in the Townsend Street area of Arco: the impacted areas are the intersection of Cochran Ave and Townsend Street and\u00a0the intersection of 7<sup>th<\/sup> Street and Norwich Street. Adjacent streets may also be impacted in order to isolate water mains during the repairs.<\/p>\n<p>Once service has been restored, a precautionary boil water advisory may be issued until 24 hours following the last point of repair. Please\u00a0<a href=\"https:\/\/www.goldenisleslepc.org\/subscribe-to-updates\/\">subscribe to receive emergency updates<\/a>\u00a0via text message, email, or phone call if this advisory becomes necessary.<\/p>\n<p>The map below details the impacted area:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-54919\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2023\/11\/tie-in.jpg\" alt=\"\" width=\"1062\" height=\"778\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order for BGJWSC and contract staff to complete maintenance upgrades as part of the Arco project two water main tie-ins, water service will be intermittently unavailable or in low pressure from at or about 9:00 a.m. to 4:00 p.m. on Thursday, November 16th, 2023, for service connections in the Townsend Street area of Arco: [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[6],"tags":[],"class_list":["post-54918","post","type-post","status-publish","format-standard","hentry","category-service-outages"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/54918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=54918"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/54918\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=54918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=54918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=54918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}