Author: jsellers

  • Finance Committee Meeting Minutes – Wednesday, May 14, 2025

    For your consideration, please read the minutes from the Finance Meeting held on Wednesday, May 14, 2025 at 3:00 p.m.

    Finance Minutes 05-14-2025 with Attachments

    To read the minutes, please open or download the pdf from the link above, or you may see more below.

     

    Brunswick-Glynn Joint Water & Sewer Commission

    1703 Gloucester Street, Brunswick, GA 31520

    Commission Meeting Room

    Wednesday, May 14, 2025, at 3:00 PM 

     

    PRESENT:                             

    Committee Chairman Ben Turnipseed

    Commissioner Dave Ford

    Commissioner Wayne Neal

    Executive Director Andrew Burroughs

     

    ALSO PRESENT:                  

    LaDonnah Roberts, Deputy Executive Director

    Harry Patel, Assistant Engineer

    Pam Crosby, Director of Procurement

    David Owens, Director of Finance

    Christa Free, Procurement Coordinator

     

    MEDIA PRESENT:                None

     

    Chairman Turnipseed called the meeting to order at 1:01 PM.

     

    Chairman Turnipseed provided an invocation.

     

    PUBLIC COMMENT PERIOD

     

    Chairman Turnipseed opened the Public Comment Period. There being no citizens that wished to address the Committee, Chairman Turnipseed closed the Public Comment Period.

     

    APPROVAL

    1. Minutes from April 16, 2025, Facilities Committee Meeting

    Commissioner Ford made a motion seconded by Commissioner Neal to approve the minutes from the Facilities Committee Meeting held on April 16, 2025. Motion carried 3-0.

     

    1. Contract Award – Lakewood Avenue Water Main Extension – A. Burroughs

    Mr. Burroughs discussed the potential expansion of the JWSC water system along Lakewood Avenue, located just north of the City limits off Community Road. Currently, there is approximately 685 feet of existing 8-inch PVC water main extending southward from Community Road, with properties beyond this section relying on private wells. Several residents in the area have reported significant issues with their wells, including sand intrusion and poor water quality, and have requested access to JWSC’s system.

    A new residential structure is currently under development approximately 360 feet from the existing water main. The property owner obtained a quote from J.H. Stone Construction to install a 2-inch line to service their home, which would meet minimum requirements for a single residence. However, in consideration of long-term infrastructure needs and resident concerns, a proposal was developed to install a more robust 8-inch water main over a 560-foot span, including a fire hydrant and a flush connection to preserve water quality until additional customers are connected or the system is looped further.

    There was a noted discrepancy in the GIS mapping system, which appears to be missing a section of the water main; however, the presence of an existing fire hydrant confirms that water infrastructure is in place, even if it is not properly documented. This area had previously been identified as a strong candidate for water system expansion under the SPLOST 2021 program. Based on current needs and future growth potential, it was recommended that JWSC proceed with the installation of the 8-inch main, fire hydrant, and flush connection at a total estimated cost of $55,000, to be funded through SPLOST 2021 proceeds.

    Commissioner Neal made a motion seconded by Commissioner Ford that the Facilities Committee recommend awarding a contract to J.H. Stone Construction, Inc in the amount of $55,000 for the Lakewood Avenue Water Extension. Motion carried 3-0.

     

    1. Contract Award – On-Call Boring Services – A. Burroughs

    Mr. Burroughs shared that there was a new bid process that was initiated for horizontal directional drilling services, expanding on a similar contract awarded several years ago. This updated solicitation included labor, equipment, tools, and incidentals for the installation of 2″, 4″, 6″, 8″, 12″, and 16″ pipe sizes—an increase from the previous bid, which covered only up to 8″. The expanded pipe diameters were included to accommodate occasional needs for larger casings beneath roads and right-of-way. All pipe materials will be supplied by JWSC, with the contractor responsible solely for the installation. Contractors are required to complete work within three weeks of receiving a purchase order.

    One bid was received from TB Landmark Construction, a contractor with a strong track record and extensive prior experience with JWSC. Their pricing was deemed reasonable and consistent with expectations, with per-foot rates ranging from $70 to $90 for standard sizes, and higher rates for the 12″ and 16″ pipe installations. TB Landmark Construction has already expressed interest in available work and is prepared to begin immediately. This contract will streamline the execution of small-scale projects by eliminating the need for separate bids on each job.

     

    Commissioner Ford made a motion seconded by Commissioner Neal that the Facilities Committee recommend awarding a contract to TB Landmark Construction, Inc. as listed in the attached bid tabulation. Motion carried 3-0.

     

    1. Infrastructure Dedications – A. Burroughs

    In Mr. Kline’s absence Mr. Burroughs was able to provide the update for the five properties involved with this approval item.

     

    The first dedication pertains to the Alpine Gateway Project near Canal Crossing, involving a section of sewer main beneath the Alpine Court public right-of-way. Only the segment between two manholes is being dedicated; all lateral connections to serve individual buildings will remain private. The second project involves the Friendly Express on Frederica Road, Saint Simons Island. This dedication includes a water and sewer easement connecting to the water main at the rear of 50 Oaks Drive, allowing future access and maintenance.

     

    The third dedication is from the Tru by Hilton hotel at Exit 29 near the “I am Nacho Mama” restaurant. The dedication includes 89 feet of water line, 64 feet of sewer line, and an access easement across the property. It was confirmed that adequate water pressure has been achieved through two improvements: discovery and opening of a closed valve and reprogramming of the SCADA system to trigger pump activation based on local pressure rather than tank levels. The fourth dedication relates to Grand Island View Phase 1, a new multifamily development off Highway 17. While all on-site water and sewer infrastructure is private, the utility is accepting an easement for access to two on-site 8-inch water meters for maintenance purposes.

     

    The fifth and final dedication is from Southport Parkway Townhomes, a 277-unit development with nine buildings located across from the Elementary School and adjacent to the Southport Wastewater facility. All water and sewer infrastructure has been inspected and accepted by the PNC team. Instead of granting easements for individual utility segments, the entire roadway is being dedicated as an easement. All record drawings and legal documents for these dedications have been reviewed and approved. It was also noted that any future maintenance performed by the utility on private property will be billed to the property owner, with prior notification given to the customer.

    Commissioner Neal made a motion seconded by Commissioner Ford that the Facilities Committee recommend the full Commission approve and accept these requests to accept infrastructure and easements with associated documentation. Motion carries 3-0.

     

    DISCUSSION

    1. Water Production Report – A. Burroughs

    Mr. Burroughs presented the Water Production Report for the month of May 2025 to the Facilities Committee. This report provides the Committee with monthly and daily water production in millions of gallons for each of the BGJWSC water production facilities (wells). The following are Brunswick District production facilities: Howard Coffin, Goodyear Park, Brunswick Villa, FLETC, I-95, Golden Isles I, Golden Isles II, Canal, and Ridgewood.  The South Mainland District wells include Fancy Bluff, Exit 29, and Brookman. Mallery, Airport, Harrington, and Hampton South are the wells located in the St. Simons Island District.

     

    1. WPCF Plant Flows Report – A. Burroughs

    Mr. Burroughs reviewed the May 2025 Monthly Wastewater Flow Report with the Committee. This report contains data regarding the influent and effluent flows, concentration of elements and chemicals, plant capacity, etc. Aside from ongoing ammonia issues at Academy Creek, the plants are operating well. Improvement is being shown on the ammonia because of improved solids handling.

     

    1. Capital Project Report –A. Burroughs

    Mr. Burroughs presented an update on the monthly Project Report for Capital Projects currently in process including those in the engineering phase and those in construction.  The Commissioners were provided with a packet containing: the Capital Project Photographs, Capital Project Report Spreadsheet, and the Capital Project Gantt Chart of project timelines.  Mr. Burroughs presented the update by highlighting projects along with excellent photographs and descriptive details on scopes of work completed as well as portions remaining for final project completion. Mr. Burroughs also reminded the Commissioners of items that are currently out for bids or pending release of bid packages.

    Chairman Turnipseed asked if there was any further business to discuss. Hearing none, Commissioner Neal made a motion seconded by Commissioner Ford to adjourn. Motion carries 3-0.

     

    Chairman Turnipseed adjourned the meeting at 1:55 p.m.

  • Combined Facilities and Finance Meeting Agenda – Wednesday, June 18, 2025 @ 10:00 AM

    For your consideration, please review the agenda for the Combined Facilities and Finance Committee Meeting scheduled to be held on Wednesday, June 18, 2025, at 10:00 a.m. in the Commission Meeting Room.

    Combined_Facilities_and_Finance_Agenda_June_18_2025 – Posted 06/13/25

  • Commission Meeting Agenda – Wednesday, June 18, 2025 @ 2:00 PM

    For your consideration, please review the agenda for the Commission Meeting scheduled to be held on Wednesday, June 18, 2025, at 2:00 p.m. in the Commission Meeting Room.

    Commission_Agenda_June_18_2025 – Posted 06/13/25

  • Planned Water Service Outage for Chapel Crossing – June 10, 2025

    Date of Outage: June 10, 2025

    Time: 7:30 AM

    Cause: Relocating Waterline

    Will boiling water be required? No

     

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Estimated Time of Repair: 2:00 PM

    What Happens Next:

    Service District: Brunswick

    Approximate Area Impacted: Chapel Crossing Rd


     

  • All-Clear Notification for Warren Mason Blvd – May 28, 2025

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Location: Warren Mason Blvd

    Date of Outage: May 28, 2025

    Time Reported: 4:15 PM

    Cause: Materials Failure

    Date/Time Restored: May 28, 2025 / 10:00 PM

    Effective immediately, all required microbiological testing of water samples from the area affected by the boil water advisory has passed. Results have been verified by our state-licensed technician within a certified laboratory environment.

    This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.

    Though the water from this system can now be considered to meet safe drinking water standards, please discard any ice made within the last 48 hours.

    Food service establishments must contact the Glynn County Environmental Health – Georgia Department of Public Health at (912) 279-2940 to be inspected prior to opening.

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates/

     

     

    Notificacion, fin de la alerta para Warren Mason Blvd – May 28, 2025

    Ubicación: Warren Mason Blvd

    Dia de Corte: May 28, 2025

    Tiempo que fue Reportado: 4:15 PM

    Causa: falla de materiales

    Dia/Tiempo de Restauracion: May 28, 2025 / 10:00 PM

    Con efecto inmediato, todas las pruebas microbiológicas requeridas de muestras de agua del área afectada por el aviso de hervir el agua han passado satisfactoriamnete. Los resultados han sido verificados por nuestro técnico con licencia estatal dentro de un entorno de laboratorio certificado.

    Esta notificación es de FIN DE ALERTA ya no será necesario hervir el agua utilizada para beber.

    Aunque ahora se puede considerar que el agua de este sistema cumple con los estándares de agua potable segura, deseche el hielo fabricado en las últimas 48 horas.

    Los establecimientos de servicios de alimentos deben comunicarse con Salud Ambiental del Condado de Glynn – Departamento de Salud Pública de Georgia al (912) 279-2940 para ser inspeccionados antes de abrir.

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    Suscríbase a nuestro sistema de notificación de emergencias: https://www.goldenisleslepc.org/subscribe-to-updates/

  • BGJWSC Budget and Rates Town Hall Meetings Scheduled For June 2025

    Each year, we hold a pair of public town hall meetings to discuss our path going forward, present the priorities of our budget prepared to help us reach our goals during the coming year, plus outline any rate and fee changes proposed.

    This year, we will hold our first meeting from 6:00 PM to 7:00 PM on Wednesday, June 11, in the Howard Coffin Park auditorium at 1402 Sonny Miller Way in Brunswick. The following night, Thursday, June 12, our second meeting will be held from 6:00 PM to 7:00 PM in room 108 of the Glynn County Casino at 550 Beachview Drive on St Simons Island.

    Seating space will be provided. Each night will include a 30-minute presentation followed by 30 minutes for discussion.

    We would like to invite you to attend virtually via our Facebook page or our YouTube channel where we will be monitoring the live feed for comments that you would like to ask. You may also email us questions in advance to the meeting. While Executive Director Andrew Burroughs will be presenting, members of our management team and commissioners will also be available in person during the meeting.

     

    Facebook Page: https://www.facebook.com/BGJWSC

    YouTube Channel: https://www.youtube.com/c/BrunswickGlynnJointWaterSewerCommission

    Email: info@bgjwsc.org

     

    All citizens are invited to attend. Thanks in advance for your participation.

    There is a possibility of a quorum of City or County Commissioners being present.

    FY 2026 Customer Notice

  • Service Restored Notification – Continue to Boil for Warren Mason Blvd – May 28, 2025

    BOIL YOUR WATER FOR THREE MINUTES BEFORE USING

     

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Location: Warren Mason Blvd

    Date of Outage: May 28, 2025

    Time Reported: 4:15 PM

    Cause: Materials Failure

    Date/Time Restored: May 28, 2025 / 10:00 PM

    Will Boiling Water Be Required?: Yes

     

    What is a Boil Water Advisory? LEARN MORE HERE

     

    What Happens Next:

    HIERVA EL AGUA DURANTE TRES MINUTOS ANTES DE USARLA

     

    Notificación de servicio restaurado para Warren Mason Blvd – May 28, 2025

    Ubicación:Warren Mason Blvd

    Dia de Corte: May 28, 2025

    Tiempo que fue Reportado: 4:15 PM

    Causa: Materials Failure

    Dia/Tiempo de Restauracion: May 28, 2025 / 10:00 PM

    Necesitara hervir el agua?: Yes

     

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    ¿Qué pasa después?:

    • Se enviará una notificación cuando ya no sea necesario hervir el agua, Aproximadamente 18 a 24 horas a partir de ahora.
    • Las actualizaciones se proporcionarán a través de nuestro sitio web: https://www.goldenisleslepc.org/news

    Suscríbase también a nuestro sistema de notificación de emergencias: https://www.goldenisleslepc.org/subscribe-to-updates/

  • Emergency Water Service Outage for Warren Mason Blvd – May 28, 2025

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Date of Outage: May 28, 2025

    Time Reported: 4:15 PM

    Cause: Materials Failure

    Will boiling water be required? Unknown at this time.

     

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Estimated Time of Repair: 6-12 hours.

    What Happens Next:

    Service District: Brunswick

    Approximate Area Impacted: Warren Mason Blvd


    Corte de Emergencia del Servicio de Agua para Warren Mason Blvd – May 28, 2025

    Dia de Corte: May 28, 2025

    Tiempo que fue Reportado: 4:15 PM

    Causa: FALLA DE MATERIALES

    Necesitara hervir el agua?: Desconocido en este momento.

     

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    Tiempo estimado de Reparación: 6-12 hours

    ¿Qué pasa después?:

    Distrito de Servicio: Brunswick

    Área Aproximada de Impacto: Warren Mason Blvd

  • All-Clear Notification for (HWY 99)Altama Plantation/Project Bruin – May 27, 2025

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Location: HWY 99

    Date of Outage: May 27, 2025

    Time Reported: 9:00 AM

    Cause: To relocate a fire hydrant and associated valves for the construction of a new road

    Date/Time Restored: May 27, 2025 / 4:55 pm

    Effective immediately, all required microbiological testing of water samples from the area affected by the boil water advisory has passed. Results have been verified by our state-licensed technician within a certified laboratory environment.

    This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.

    Though the water from this system can now be considered to meet safe drinking water standards, please discard any ice made within the last 48 hours.

    Food service establishments must contact the Glynn County Environmental Health – Georgia Department of Public Health at (912) 279-2940 to be inspected prior to opening.

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates/

     

     

    Notificacion, fin de la alerta para (HWY 99)Altama Plantation/Project Bruin – May 27, 2025

    Ubicación:HWY 99

    Dia de Corte: May 27, 2025

    Tiempo que fue Reportado: 4:36 PM

    Causa: valvula rota por contratista

    Dia/Tiempo de Restauracion: May 27, 2025 / 4:55 pm

    Con efecto inmediato, todas las pruebas microbiológicas requeridas de muestras de agua del área afectada por el aviso de hervir el agua han passado satisfactoriamnete. Los resultados han sido verificados por nuestro técnico con licencia estatal dentro de un entorno de laboratorio certificado.

    Esta notificación es de FIN DE ALERTA ya no será necesario hervir el agua utilizada para beber.

    Aunque ahora se puede considerar que el agua de este sistema cumple con los estándares de agua potable segura, deseche el hielo fabricado en las últimas 48 horas.

    Los establecimientos de servicios de alimentos deben comunicarse con Salud Ambiental del Condado de Glynn – Departamento de Salud Pública de Georgia al (912) 279-2940 para ser inspeccionados antes de abrir.

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    Suscríbase a nuestro sistema de notificación de emergencias: https://www.goldenisleslepc.org/subscribe-to-updates/