Category: Previous Project Updates
-
HWY 341/Crispen BLVD
- Project Number: #2215B
- District and General Location: North Mainland District HWY 341 and Crispen BLVD Intersection
- Total Budget: $700k
- Anticipated Construction Completion Date: November 2023
- Details: The project consists of a sewer line repair that has corroded from the inside out, causing a sinkhole underneath the roadway. The anticipated start date will be following the Labor Day holiday.
- Purpose: The purpose of the project is to repair the failed sewer line and restore the roadway pavement.
- Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org


Monthly Active Construction Project Photo Report(s):
-
The Flow Show – Episode 13
During this episode of The Flow Show, we take a look at a few projects from the JWSC. These projects include the rehab of the Oglethorpe & Glynn Place Mall elevated storage tank, LS 2002 Forcemain installation, and a system-wide water meter replacement program.
-
Project Info – City Brunswick – Brunswick Villa Area Sewer Extension
-
- Project Number:
- District and General Location: The City of Brunswick District in the Brunswick Villa Area Neighborhood
- Total Budget: $2.75M
- Anticipated Construction Completion Date: TBD
- Details: The project consists of extending the sewer to the Brunswick Area Neighborhood where public sewer maintained by the JWSC is not available. These areas may be undeveloped properties, but most often consists of existing residences or even entire subdivisions that rely on individual septic tanks for on-site wastewater management.
- Purpose: The purpose of the project is to replace aging septic systems and protect water quality, public health, and the environment.
- Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
2024 October Brunswick Villa Area Sewer Extension
2024 October Brunswick Villa Area Sewer Extension (2)
2024 November Brunswick Villa Area Sewer Extension
2024 November Brunswick Villa Area Sewer Extension (2)
2024 December Brunswick Villa Area Sewer Extension (2)
2024 December Brunswick Villa Area Sewer Extension
2025 January Brunswick Villa Area Sewer Extension (2)
2025 January Brunswick Villa Area Sewer Extension
2025 February Brunswick Villa Area Sewer Extension
2025 March Brunswick Villa Area Sewer Extension
2025 April Brunswick Villa Area Sewer Extension
2025 May Brunswick Villa Area Sewer Extension
2025 June Brunswick Villa Area Sewer Extension
-
-
Project Info – Mall EST and Oglethorpe EST Rehab
-
- Project Number:
- District and General Location: Glynn Place Mall EST, North Mainland District Oglethorpe EST, Saint Simons Island District.
- Total Budget: $1M
- Anticipated Construction Completion Date: TBD
- Details: The project consists of rehabilitation and painting for the Elevated Storage Tank (EST) at Glynn Place Mall EST and Oglethorpe EST.
- Purpose: The purpose of the project is to provide reliable water supply and pressure for the surrounding community and fire suppression needs while preserving water quality and meeting regulatory requirements.
- Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
2022_November_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2022_December_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_January_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_February_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_March_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_April_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_June_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_July_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_August_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_September_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_October_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_NOVEMBER_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2023_December_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_January_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_February_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_April_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_MAY_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_May_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES (2)
2024_JUNE_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
2024_JULY_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES
-
-
Project Info – North Mainland – Pump Station 4105 Forcemain Reroute
-
- Project Number:
- District and General Location: Located in the North Mainland District along Cate Road and Crispen Boulevard toward Highway 341.
- Total Budget: $1.25M
- Anticipated Construction Completion Date: TBD
- Details: The project consists of installing a new forcemain from Pump Station 4105 to Highway 341
- Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings and wear on existing pump station equipment.
- Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
2022_May_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2022_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2022_August_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)
2024_July_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_July_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)
2024_August_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_September_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_September_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)
2024_October_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_November_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_November_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)
2024_December_Project_Photos_North_Mainland_4105_Forcemain_Reroute
2024_December_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)
-
-
Project Info – Academy Creek Ras Replacement
-
- Project Number:
- District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
- Total Budget: $1.5M
- Anticipated Construction Completion Date: TBD
- Details: The project consists of replacing existing return activated sludge (RAS) pumps, piping, and electrical with chopper-style pumps due to the existing equipment systems reaching the end of their service life and needing to be replaced.
- Purpose: The purpose of the project is to replace aging equipment to maintain a high level of service and reliability at the wastewater treatment plant.
- Have More Questions? Please Contact Andrew Burroughs, P.E., Executive Director by email here: aburroughs@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
2024 September Academy Creek RAS project
2024 September Academy Creek RAS project (2)
2024 September Academy Creek RAS project (3)
2024 October Academy Creek RAS project
2024 October Academy Creek RAS project (2)
2024 November Academy Creek RAS project (2)
2024 November Academy Creek RAS project
2024 December Academy Creek RAS project (2)
2024 December Academy Creek RAS project
2025 January Academy Creek RAS project
2025 January Academy Creek RAS project (4)
2025 January Academy Creek RAS project (3)
2025 January Academy Creek RAS project (2)
2025 February Academy Creek RAS project
2025 March Academy Creek RAS project
2025 April Academy Creek RAS project
2025 May Academy Creek RAS project
2025 June Academy Creek RAS project
2025 July Academy Creek RAS project
2025 August Academy Creek RAS project
2025 September Academy Creek RAS project
2025 October Academy Creek RAS project
2025 November Academy Creek RAS project
2025 December Academy Creek RAS project
-
-
Project Info – South Mainland – City of Brunswick – Pump Station 3101, 4001, and 4002 Upgrade
-
- Project Number:
- District and General Location: PS3101 on 293 South Port Parkway, South Mainland PS4001 on 301 3rd Avenue, the City of Brunswick PS4002 on 1309 Reynold Street, City of Brunswick.
- Total Budget: $TBD
- Anticipated Construction Completion Date: TBD
- Details: The project consists of the repair of the station roofs, and painting, along with pump and piping modifications. Detailed station work includes the magnetic flow meter installation, odor control unit, replacing outdated electrical and SCADA equipment, and building repairs with site improvements.
- Purpose: The purpose of the project is to address the aging infrastructure, increase capacity to serve the area, and ensure reliable operation of these critical wastewater facilities.
- Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
2024 April Pump Station 3101, 4001, and 4002 Upgrade
2024 April Pump Station 3101, 4001, and 4002 Upgrade (2)
2024 April Pump Station 3101, 4001, and 4002 Upgrade (3)
2024 May Pump Station 3101, 4001, and 4002 Upgrade
2024 May Pump Station 3101, 4001, and 4002 Upgrade (2)
2024 May Pump Station 3101, 4001, and 4002 Upgrade (3)
2024 June Pump Station 3101, 4001, and 4002 Upgrade
2024 June Pump Station 3101, 4001, and 4002 Upgrade (2)
2024 June Pump Station 3101, 4001, and 4002 Upgrade (3)
2024 June Pump Station 3101, 4001, and 4002 Upgrade (4)
2024 July Pump Station 3101, 4001, and 4002 Upgrade
2024 July Pump Station 3101, 4001, and 4002 Upgrade 2
2024 July Pump Station 3101, 4001, and 4002 Upgrade 3
2024 August Pump Station 3101, 4001, and 4002 Upgrade
2024 August Pump Station 3101, 4001, and 4002 Upgrade (2)
2024 August Pump Station 3101, 4001, and 4002 Upgrade (3)
2024 September Pump Station 3101, 4001, and 4002 Upgrade
2024 September Pump Station 4002 Basin CIPP
2024 October Pump Station 3101, 4001, and 4002 Upgrade
2024 October Pump Station 3101, 4001, and 4002 Upgrade 2)
2024 October Pump Station 4002 Basin CIPP
2024 November Pump Station 3101, 4001, and 4002 Upgrade
2024 November Pump Station 3101, 4001, and 4002 Upgrade (2)
2024 November Pump Station 4002 Basin CIPP
2024 November Pump Station 4002 Basin CIPP (2)
2024 December Pump Station 3101, 4001, and 4002 Upgrade
2024 December Pump Station 4002 Basin CIPP
2024 December Pump Station 4002 Basin CIPP (3)
2024 December Pump Station 4002 Basin CIPP (2)
2025 January Pump Station 3101, 4001, and 4002 Upgrade
2025 January Pump Station 3101, 4001, and 4002 Upgrade (4)
2025 January Pump Station 3101, 4001, and 4002 Upgrade (3)
2025 January Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 January Pump Station 4002 Basin CIPP (3)
2025 January Pump Station 4002 Basin CIPP (2)
2025 January Pump Station 4002 Basin CIPP
2025 February Pump Station 3101, 4001, and 4002 Upgrade
2025 February Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 February Pump Station 4002 Basin CIPP
2025 March Pump Station 3101, 4001, and 4002 Upgrade
2025 March Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 March Pump Station 4002 Basin CIPP
2025 April Pump Station 3101, 4001, and 4002 Upgrade
2025 April Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 April Pump Station 3101, 4001, and 4002 Upgrade (3)
2025 April Pump Station 4002 Basin CIPP
2025 May Pump Station 3101, 4001, and 4002 Upgrade
2025 May Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 May Pump Station 3101, 4001, and 4002 Upgrade (3)
2025 May Pump Station 4002 Basin CIPP
2025 June Pump Station 3101, 4001, and 4002 Upgrade
2025 June Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 June Pump Station 3101, 4001, and 4002 Upgrade(3)
2025 July Pump Station 3101, 4001, and 4002 Upgrade
2025 July Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 August Pump Station 3101, 4001, and 4002 Upgrade
2025 August Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 August Pump Station 3101, 4001, and 4002 Upgrade (3)
2025 September Pump Station 3101, 4001, and 4002 Upgrade
2025 September Pump Station 3101, 4001, and 4002 Upgrade (2)
2025 September Pump Station 3101, 4001, and 4002 Upgrade (3)
2025 October Pump Station 3101, 4001, and 4002 Upgrade
-