Category: Sanitary Sewer Overflow

  • Sanitary Sewer Overflow at Academy Creek in Brunswick – August 5, 2025

    The Brunswick-Glynn Joint Water & Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on August 5, 2025 into the Academy Creek.

    Date of Spill: 8/5/2025

    Time: 9:12 PM

    Location of Spill: 2909 Newcastle Street

    Cause of Spill: The overflow was primarily caused by a failure of the SCADA (Supervisory Control and Data Acquisition) system, which resulted in a loss of visibility and control at the headworks. This failure delayed the activation of critical pumping systems and prevented timely detection of rising wet well levels.
    Compounding the issue, the analog alarm system located at the headworks—designed to alert the operations building in the event of high-water levels—was non-functional at the time of the incident. Had this alarm been operational, it would have provided early warning and likely prevented the wet well from flooding above floor level.
    Additionally, the two overhead monitors in the operations building, which are intended to provide continuous visual monitoring of the wet well, were also not functioning. These monitors would have clearly indicated the SCADA outage and allowed for immediate corrective action.
    The simultaneous failure of these critical monitoring and alert systems significantly contributed to the delayed response and the resulting overflow.

    Estimated Volume of Discharge: Approximately 2,000 gallons

    Discharged: Manhole into a storm drain

    Corrective Action Taken:

    – Manual activation of pumps to reduce wet well levels
    – Debris washdown at the headworks
    – Inspection of affected areas
    – Coordination among operators for containment and response
    – Restoration of SCADA system
    – Bypass gate raised to reduce overflow Vac-Con Cleanup (see Photos 10 for visual reference).

    Contact for Any Additional Information:

    Angela Walker, Assistant Director of Wastewater Operations
    Brunswick-Glynn Joint Water & Sewer Commission
    Phone Number: 912-217-1111
    Email: awalker@bgjwsc.org 

  • Sanitary Sewer Overflow at Academy Creek in Brunswick – July 11, 2025

    The Brunswick-Glynn Joint Water & Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on July 11, 2025 into the Academy Creek.

    Date of Spill: 7/11/2025

    Time: 12:45 AM

    Location of Spill: 2909 Newcastle Street

    Cause of Spill: Heavy rainfall led to significantly increased flows at the plant. The planned capital improvement project underway at the facility has temporarily reduced high flow capacity at the facility to allow for the installation of new equipment.

    Estimated Volume of Discharge: 125,776 gallons

    State Waters Discharged: Academy Creek

    Corrective Action Taken: Staff opened the basin that was offline for the capital improvement project to divert flow until flow receded.  Flow was contained in the tank and is being returned to the plant influent for treatment.

    Contact for Any Additional Information:

    Angela Walker, Assistant Director of Wastewater Operations
    Brunswick-Glynn Joint Water & Sewer Commission
    Phone Number: 912-217-1111
    Email: awalker@bgjwsc.org 

  • Sanitary Sewer Overflow at 1253 B&W Grade Rd in Brunswick – May 9, 2024

    The Brunswick-Glynn Joint Water & Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on Thursday, May 9, 2024, into Yellow Bluff Creek.

    Date of Spill: 5/9/2024

    Time: 4:23 PM

    Location of Spill:  Lift Station 4036 1253 B&W Grade Rd  Brunswick, GA 31520

    Cause of Spill: A power outage from a storm.

    Estimated Volume of Discharge: Approximately 95,253 gallons

    State Waters Discharged:  Discharged into Yellow Bluff Creek, Brunswick, GA

    Corrective Action Taken:

    Lift station technicians and vacuum pumping system crews worked in unison to control the flow of the lift station until power could be temporarily restored via generator. Staff placed notification signs along Yellow Bluff Creek and contacted local environmental authorities. Laboratory technicians will continue to test this area to determine if any further environmental abatement is necessary.

    Public Notification:

    This notification is being provided to Georgia Environmental Protection Division, Glynn County Department of Public Health, local print media, and local radio stations for further dissemination.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn Joint Water & Sewer Commission
    Phone Number: 912-261-7152
    Email: kyoung@bgjwsc.org 

  • Sanitary Sewer Overflow – Spanish Cove Area of Brunswick – November 7, 2022

    The Brunswick-Glynn Joint Water Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on Monday, November 7, 2022.

    Location of Spill:        11 Bishop Lane Brunswick, Georgia 31525

    Cause of Spill:            Materials failure of the 16″ force main serving sewer basin 4028.

    Estimated Volume:    42,264  gallons

    Receiving Stream:     Hog Crawl Creek

    Corrective Actions Taken:  Repaired broken sections of pipe.

    This notification is being provided to Georgia Environmental Protection Division, Glynn County Department of Public Health, the Brunswick News, and local iHeartRadio stations.

    For any additional information, please contact Alvin Lang, Plant Supervisor, at 912-717-0446

  • Sanitary Sewer Overflow at 2909 Newcastle Street in Brunswick – March 23, 2022

    The Brunswick-Glynn Joint Water Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on Wednesday, March 23, 2022 at the Academy Creek Water Pollution Control Facility.

    Location of Spill:        2909 Newcastle Street Brunswick, Georgia 31520

    Cause of Spill:            Due to the ongoing construction activities at the plant, hydraulic issues were present at high flow between the final clarifiers and tertiary filters. Heavy rainfall increased plant flow levels rapidly causing the backup between the clarifiers and filters.

    Estimated Volume:    28,000 gallons

    Receiving Stream:     Academy Creek (Satilla River Basin)

    Corrective Actions Taken:  Vacuum trucks were able to recover a portion of the overflow. Weir plates installed to divert flow into filter structure temporarily have been removed. Modifications to influent weirs on filters will occur prior to filter structure being brought back online.

    This notification is being provided to Georgia Environmental Protection Division, Glynn County Department of Public Health, the Brunswick News, and local iHeartRadio stations.

    For any additional information, please contact Alvin Lang, Plant Supervisor, at 912-717-0446

  • Sanitary Sewer Overflow at 1498 Demere Rd. St. Simons Island – June 29, 2021

    The Brunswick Glynn Joint Water & Sewer Commission, operating under NPDES Permit GA0025313 in accordance with DNR Regulation 391-3-6-05 Emergency Actions, hereby make public notification of a wastewater spill that was reported on 6/29/2021 at 1498 Demere Rd.

    Date of Spill: 6/29/2021

    Time Reported: 4:30 pm

    Location of Spill:
    Storm Ditch behind 1498 Demere Rd. St. Simons Island, Ga 31522

    Cause of Spill:  Leaking 8″ Ductile Iron Gravity Main

    Estimated Volume of Discharge: Less than 25 gallons

    State Waters Discharged: Goulds Inlet

    Corrective Action Taken:  Repair 8″ Ductile Iron Gravity Main

    Regulatory Compliance: Signs will be placed along the immediately affected areas to indicate the presence of a sanitary sewer overflow (SSO). The Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department District Environmental Health Manager.

    Immediate Results and Investigation: The BGJWSC is on site for clean-up of the effective area. The BGJWSC Lab will be taking samples at the spill site in accordance to the EPD regulations.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn Joint Water and Sewer Commission
    Phone Number 912-261-7152
    Email kyoung@bgjwsc.org

  • Sanitary Sewer Overflow at 1919 Glynn Ave – Lanier Plaza in Brunswick – March 15, 2021

    The Brunswick Glynn Joint Water & Sewer Commission, operating under NPDES Permit GA0025313 in accordance with DNR Regulation 391-3-6-05 Emergency Actions, hereby make public notification of a wastewater spill that was reported on 3/15/2021 at 1919 Glynn Ave.

    Date of Spill: 3/15/2021

    Time Reported: 1:55 pm

    Location of Spill:
    Storm Ditch
    1919 Glynn Ave
    Brunswick, GA. 31523

    Cause of Spill:  Contractor Bypass Malfunction.

    Estimated Volume of Discharge: 200 Gal.

    State Waters Discharged: Terry Creek

    Corrective Action Taken:  The contractor started his bypass pumps

    Regulatory Compliance: Signs will be placed along the immediately affected areas to indicate the presence of a sanitary sewer overflow (SSO). The Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department District Environmental Health Manager.

    Immediate Results and Investigation: The BGJWSC has 1 Vac-Truck on site for clean-up and spreading lime on the effective area. The BGJWSC Lab will be taking samples at the spill site in accordance to the EPD regulations.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn Joint Water and Sewer Commission
    Phone Number 912-261-7152
    Email kyoung@bgjwsc.org

    Photos below Indicate the condition of the spill observed by BGJWSC staff during initial cleanup and inspection:

  • Sanitary Sewer Overflow on Whitlock Street in Brunswick – November 7, 2019

    The Brunswick Glynn Joint Water & Sewer Commission, operating under NPDES Permit GA0025313 in accordance with DNR Regulation 391-3-6-05 Emergency Actions, hereby make public notification of a wastewater spill that was reported on 11/7/19 at the corner of Whitlock St. and Old Jesup Rd.

    Date of Spill: 11/7/19

    Time Reported: 8:00 am

    Location of Spill:
    Storm Ditch
    Whitlock & Old Jesup
    Brunswick, GA. 31523

    Cause of Spill:  Bypass pump malfunction. A clamp connection failed in the storm drain.

    Estimated Volume of Discharge: 8,000 Gal.

    State Waters Discharged: Brunswick River Basin

    Corrective Action Taken: The contractor shut down the bypass and repaired the clamp connection.

    Regulatory Compliance: Signs were placed along the immediately affected areas to indicate the presence of a sanitary sewer overflow (SSO). The Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department District Environmental Health Manager.

    Immediate Results and Investigation: The contractor has 4 Vac-Trucks on site for clean-up and spreading lime on the effective area. The BGJWSC Lab will be taking samples at the spill site in accordance to the EPD regulations.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn County Joint Water and Sewer Commission
    Phone Number 912-261-7152
    Email kyoung@bgjwsc.org

  • Sanitary Sewer Overflow on Bishop Lane in Brunswick – July 28, 2018

    The Brunswick Glynn Joint Water & Sewer Commission NPDES Permit GA0025313, in accordance with the conditions of this permit and DNR Regulation 391-3-6-05 Emergency Actions, hereby make Public Notification of a wastewater spill that was reported 7/28/2018 at 3:00 PM due a materials failure in the force main piping.

    Date of Spill: 7/28/2018

    Time Reported: 3:00 p.m.

    Location of Spill:   A sanitary sewer pumping station (LS 4028) located at 100 Bishop Lane in Brunswick.

    Cause of Spill:   Malfunction of a gasket on the 16 inch bypass force main.

    Estimated volume of discharge:  100,000 gallons

    State Waters Discharged: Hog Crawl Creek and Hidden Lakes Drainage Lake

    Corrective Action Taken:  JWSC personnel bypassed the section of force main with the malfunctioning gasket which let the lift station run in normal operation until repair to the gasket could be made. The JWSC Laboratory will continue to test this area.  The EPD was notified, local authorities and the Glynn County Health Department District Environmental Health Manager will also be notified.

    Regulatory Compliance:  Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department Coastal District Environmental Health Manager.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn County Joint Water and Sewer Commission
    Phone Number 912-261-7152
    Email kyoung@bgjwsc.org

  • Sanitary Sewer Overflow on Parkwood Drive in Brunswick – July 19, 2018

     

    The Brunswick Glynn Joint Water & Sewer Commission NPDES Permit GA0025313, in accordance with the conditions of this permit and DNR Regulation 391-3-6-05 Emergency Actions, hereby make Public Notification of a wastewater spill that was reported 7/19/2018 at 4:30 PM due to debris obstructing the normal flow.

    Date of Spill:      7/19/2018

    Time Reported: 4:30 p.m.

    Location of Spill:   A sanitary sewer manhole (SMH-4WTP0470) at the intersection of Parkwood Drive and N. Cleburn Street.

    Cause of Spill:  Debris in gravity main obstructing flow from Sewer Pump Station 4017 force main discharge to sewer gravity main.

    Estimated volume of discharge:  400 gallons

    State Waters Discharged: Terry Creek

    Corrective Action Taken:  Staff observed the event and shut down the station within minutes of the event. Due to heavy rains the untreated sewer which escaped from the manhole mixed with water within the flooded roadway and went down the storm drains. It was not possible to recover the spill. Level within the gravity lines and lift station was carefully maintained below overflow level while the line was cleared of debris. The JWSC laboratory will continue to test this area.

    Regulatory Compliance: Signs were not placed along the immediately affected areas to indicate the presence of a sanitary sewer overflow (SSO) due to the ongoing rain event. The Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department Coastal District Environmental Health Manager.

    Contact for Any Additional Information:

    Kirk Young, Superintendent
    Systems Pumping and Maintenance Division
    Brunswick-Glynn County Joint Water and Sewer Commission
    Phone Number 912-261-7152
    Email kyoung@bgjwsc.org