Blog

  • Commission Meeting Minutes – Thursday, July 17 , 2025

    For your consideration, please read the minutes from the Commission Meeting held on Thursday, July 17, 2025 at 2:00 p.m. in the Commission Meeting Room.

    Commission Minutes_07-17-2025

    To read the minutes, please open or download the pdf from the link above.

  • Road Closure – Albany Street & 1st Avenue – August 22, 2025

    Summary: To install a new manhole structure

    Date of Road Closure: 8/22/2025

    Cause: Manhole Installation

    Estimated Time of Repair: 8:00 AM to 5:00 PM

    What Happens Next:

    Service District: Brunswick

    Approximate Area Impacted: Albany Street & 1st Ave


    Fecha de calle cerado: 8/22/2025

    Causa: Manhole Installation

    Tiempo etimado de Reparación: 8:00 AM to 5:00 PM

    ¿Qué pasa después?:

    Distrito de Servicio: Brunswick

    Área Aproximada de Impacto: Albany Street & 1st Ave

  • Commission Meeting Agenda – Thursday, August 21, 2025 @ 2:00 PM

    For your consideration, please review the agenda for the Commission Meeting scheduled to be held on Thursday, August 21, 2025, at 2:00 p.m. in the Commission Meeting Room.

    Commission_Agenda_August_21_2025 – Posted 08/15/25

  • Finance Meeting Agenda – Wednesday, August 20, 2025 @ 3:00 PM

    For your consideration, please review the agenda for the Finance Committee Meeting scheduled to be held on Wednesday, August 20, 2025, at 3:00 p.m. in the Commission Meeting Room.

    Finance_Agenda_August_20_2025 – Posted 08/15/25

  • Facilities Meeting Agenda – Wednesday, August 20, 2025 @ 10:00AM

    For your consideration, please review the agenda for the Facilities Committee Meeting scheduled to be held on Wednesday, August 20, 2025, at 10:00 a.m. in the Commission Meeting Room.

    Facilities_Agenda_August_20_2025 – Posted 08/15/25

  • All-Clear Notification for Youngwood Drive – August 7, 2025

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Location: Youngwood Drive

    Date of Outage: August 7, 2025

    Time Reported: 2:58 PM

    Cause: Materials Failure

    Date/Time Restored: August 7, 2025, 3:45 PM

    Effective immediately, all required microbiological testing of water samples from the area affected by the boil water advisory has passed. Results have been verified by our state-licensed technician within a certified laboratory environment.

    This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.

    Though the water from this system can now be considered to meet safe drinking water standards, please discard any ice made within the last 48 hours.

    Food service establishments must contact the Glynn County Environmental Health – Georgia Department of Public Health at (912) 279-2940 to be inspected prior to opening.

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates/


     

     

    Notificacion, fin de la alerta para Youngwood Drive – August 7, 2025

    Ubicación: Youngwood Drive

    Dia de Corte: August 7, 2025

    Tiempo que fue Reportado: 2:58 PM

    Causa: falla de materiales

    Dia/Tiempo de Restauracion: August 7, 2025, 3:45 PM

    Con efecto inmediato, todas las pruebas microbiológicas requeridas de muestras de agua del área afectada por el aviso de hervir el agua han passado satisfactoriamnete. Los resultados han sido verificados por nuestro técnico con licencia estatal dentro de un entorno de laboratorio certificado.

    Esta notificación es de FIN DE ALERTA ya no será necesario hervir el agua utilizada para beber.

    Aunque ahora se puede considerar que el agua de este sistema cumple con los estándares de agua potable segura, deseche el hielo fabricado en las últimas 48 horas.

    Los establecimientos de servicios de alimentos deben comunicarse con Salud Ambiental del Condado de Glynn – Departamento de Salud Pública de Georgia al (912) 279-2940 para ser inspeccionados antes de abrir.

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    Suscríbase a nuestro sistema de notificación de emergencias: https://www.goldenisleslepc.org/subscribe-to-updates/

  • Service Restored Notification – Continue to Boil for Youngwood Drive – August 7, 2025

    BOIL YOUR WATER FOR THREE MINUTES BEFORE USING

    Location: Youngwood Drive

    Date of Outage: August 7, 2025

    Time Reported: 2:58 PM

    Cause: Materials Failure

    Date/Time Restored: 3:45 PM

    Will Boiling Water Be Required?: Yes

    What is a Boil Water Advisory? LEARN MORE HERE

    What Happens Next?:

    An all-clear notification will be sent when water no longer needs to be boiled, approximately 18-24 hours from now.

    Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates

    ——————————————————————————————————————————————————————————————————

    Haga clic en el texto etiquetado “Please click here to acknowledge receipt of this message” arriba para confirmar este mensaje.

    HIERVA EL AGUA DURANTE TRES MINUTOS ANTES DE USARLA

    Ubicación: Youngwood Drive

    Dia de Corte: August 7,2025

    Tiempo que fue Reportado: 2:58 PM

    Causa: falla de materiales

    Dia/Tiempo de Restauracion: 3:45 PM

    Necesitara hervir el agua?: Yes

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

    ¿Qué pasa después?:

    se enviará una notificación cuando ya no sea necesario hervir el agua, Aproximadamente 18 a 24 horas a partir de ahora.

    las actualizaciones se proporcionarán a través de nuestro sitio web: https://www.goldenisleslepc.org/news

    suscríbase a nuestro sistema de notificación de emergencias: https://www.goldenisleslepc.org/subscribe-to-updates/

  • Emergency Water Service Outage for Youngwood Drive – August 7, 2025

    English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.

     

    Date of Outage: August 7, 2025

    Time Reported: 2:58 PM

    Cause: • Materials Failure

    Will boiling water be required? Unknown at this time.

     

    What is a Boil Water Advisory? LEARN MORE HERE

     

    Estimated Time of Repair: 6-12 hours.

    What Happens Next:

    Service District: SSI

    Approximate Area Impacted: Santa Maria Circle


     

    Corte de Emergencia del Servicio de Agua para Youngwood Drive – August 7, 2025

    Dia de Corte: August 7, 2025

    Tiempo que fue Reportado: 2:58 pm

    Causa: (falla de materiales)

    Necesitara hervir el agua?: Desconocido en este momento.

     

    ¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ

     

    Tiempo estimado de Reparación: 6-12 horas

    ¿Qué pasa después?:

    Distrito de Servicio: SSI

    Área Aproximada de Impacto: Santa Maria Circle

  • Sanitary Sewer Overflow at Academy Creek in Brunswick – August 5, 2025

    The Brunswick-Glynn Joint Water & Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on August 5, 2025 into the Academy Creek.

    Date of Spill: 8/5/2025

    Time: 9:12 PM

    Location of Spill: 2909 Newcastle Street

    Cause of Spill: The overflow was primarily caused by a failure of the SCADA (Supervisory Control and Data Acquisition) system, which resulted in a loss of visibility and control at the headworks. This failure delayed the activation of critical pumping systems and prevented timely detection of rising wet well levels.
    Compounding the issue, the analog alarm system located at the headworks—designed to alert the operations building in the event of high-water levels—was non-functional at the time of the incident. Had this alarm been operational, it would have provided early warning and likely prevented the wet well from flooding above floor level.
    Additionally, the two overhead monitors in the operations building, which are intended to provide continuous visual monitoring of the wet well, were also not functioning. These monitors would have clearly indicated the SCADA outage and allowed for immediate corrective action.
    The simultaneous failure of these critical monitoring and alert systems significantly contributed to the delayed response and the resulting overflow.

    Estimated Volume of Discharge: Approximately 2,000 gallons

    Discharged: Manhole into a storm drain

    Corrective Action Taken:

    – Manual activation of pumps to reduce wet well levels
    – Debris washdown at the headworks
    – Inspection of affected areas
    – Coordination among operators for containment and response
    – Restoration of SCADA system
    – Bypass gate raised to reduce overflow Vac-Con Cleanup (see Photos 10 for visual reference).

    Contact for Any Additional Information:

    Angela Walker, Assistant Director of Wastewater Operations
    Brunswick-Glynn Joint Water & Sewer Commission
    Phone Number: 912-217-1111
    Email: awalker@bgjwsc.org