For your consideration, please review the agenda for the Facilities Committee Meeting scheduled to be held on Thursday, September 17, 2026, at 10:30 a.m. in the Commission Meeting Room.
Facilities_Agenda_September_17_2026 – Posted 9/11/2026
For your consideration, please review the agenda for the Facilities Committee Meeting scheduled to be held on Thursday, September 17, 2026, at 10:30 a.m. in the Commission Meeting Room.
Facilities_Agenda_September_17_2026 – Posted 9/11/2026
For your consideration, please review the agenda for the Commission Meeting scheduled to be held on Thursday, September 17, 2026, at 2:00 p.m. in the Commission Meeting Room.
Commission_Agenda_September_17_2026 – Posted 9/11/2026
IFB 27-004 – Construction Services Golden Isles Parkway Force Main Extension
Golden Isles Parkway FM Extension Bid Form
Golden Isles FM ext final UPDATED 10-1-26
1.0-Design-Standards-2024-Revision-04.16.26
Section-4.0-Technical-Specifications-2024
RFP No. 27-004 GIP Force Main Extension – Addendum 1
For your consideration, please read the minutes from the Facilities Committee Meeting held on Wednesday, July 15, 2026 at 10:00 a.m. in the Commission Meeting Room.
Facilities Committee Minutes_7-15-2026
To read the minutes, please open or download the pdf from the link above.
For your consideration, please read the minutes from the Finance Committee Meeting held on Wednesday, July 15, 2026 at 3:00 p.m. in the Commission Meeting Room.
Finance Committee Minutes_7-15-2026
To read the minutes, please open or download the pdf from the link above.
For your consideration, please read the minutes from the Commission Meeting held on Thursday, July 16, 2026 at 2:00 p.m. in the Commission Meeting Room.
To read the minutes, please open or download the pdf from the link above.
Location: Dunbar Creek Point
Date of Outage: September 9, 2026
Time Reported: 9:00 AM
Cause: Hydrant Replacement
Date/Time Restored: 4:00 AM
Will Boiling Water Be Required?: No
What is a Boil Water Advisory? LEARN MORE HERE
Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates/
Date of Outage: September 9, 2026
Time: 9:00 AM
Cause: Hydrant Installation
Will boiling water be required? No
What is a Boil Water Advisory? LEARN MORE HERE
Estimated Time of Repair: 4:00 PM
What Happens Next:
Service District: SSI
Approximate Area Impacted: Dunbar Creek Point
Location: Dunbar Creek Point
Date of Outage: September 4, 2026
Time Reported: 9:00 AM
Cause: Hydrant Replacement
Date/Time Restored: 11:25 AM
Will Boiling Water Be Required?: No
What is a Boil Water Advisory? LEARN MORE HERE
Please subscribe to our emergency notification system: https://www.goldenisleslepc.org/subscribe-to-updates/
Date of Outage: September 4, 2026
Time: 9:00 AM
Cause: Hydrant Replacement
Will boiling water be required? No
What is a Boil Water Advisory? LEARN MORE HERE
Estimated Time of Repair: 4:00 PM
What Happens Next:
Service District: SSI
Approximate Area Impacted: Dunbar Creek Point