Road Closure – 1400 Block of Windward Drive on St. Simons Island – Monday, June 19, 2017

Attention

Road Closure Notification

In order to perform sewer service repairs in the area, the 1400 block of Windward Drive in Sea Palms will be closed to thru traffic, between Colonial Drive and Great Oak Place, from 8:00 a.m. on Monday, June 19th, 2017 until 5:00 p.m. on Tuesday, June 20th, 2017. Homeowner access will be maintained but all other traffic should be prepared to take another route.

BGJWSC crew members will be repairing a broken 4″ clay sanitary sewer service connected to 1411 Windward Drive.

For more information on the project, please contact Jay Sellers at 912.261.7123 or Charita Emory at 261.7151.

The BGJWSC apologizes in advance for the inconvenience.

Sanitary Sewer Overflow on St. Simons Island – June 9, 2017

Update 6/12/2017 at 9:41: A map has been added below to indicate the affected area. More details as to the cause of the spill and the results have also been added.

The Brunswick Glynn Joint Water & Sewer Commission, operating under NPDES Permit GA0025313 in accordance with aforesaid permit and DNR Regulation 391-3-6-05 Emergency Actions, hereby make public notification of a wastewater spill that was reported on Friday, June 9, 2017 from an electrical failure at sanitary sewer pumping station 2023.

Date of Spill: 6/9/2017

Time: 10:00 AM

Location of Spill:
Gascoigne Lodge
1000 New Sea Island Road
St. Simons Island, Georgia 31522

Cause of Spill:  An apparent electrical equipment malfunction at sanitary sewer pumping station 2023 at 43 Kings Way caused the sewer system to surcharge and overflow at a manhole at 1000 New Sea Island Road behind apartment 9.

Estimated Volume of Discharge: >10,000 Gallons. Historical flow estimates at this pumping station place the discharge in the area of 10,000 to 20,000 gallons, though the volume of rain over the previous week may have led to a high concentration of ground water in that discharge.

State Waters Discharged: Gascoigne Pond

Corrective Action Taken: JWSC personnel repaired the electrical equipment malfunction at pumping station 2023 at 43 Kings Way and the station was brought back to working order. The JWSC spread lime on the affected area of the shoreline, approximately 6 square feet. The JWSC is also are running two bypass pumps in Gascoigne Pond to aerate the affected receiving waters. The JWSC laboratory will continue to test this area.

Regulatory Compliance: Signs were placed along the immediately affected areas to indicate the presence of a sanitary sewer overflow (SSO). The Environmental Protection Division of the Georgia Department of Natural Resources was notified, along with local authorities and the Glynn County Health Department District Environmental Health Manager.

Immediate Results and Investigation: As of 8:44 on Monday morning, June 12, 2017, pumping station 2023 is functioning properly again. The Supervisory Control and Data Acquisition (SCADA) communications equipment has been replaced and tested using a ‘known-good’ backup unit. The water in the associated pond where the overflow drained to has been aerated following the discovery of the spill, with staff reacting with the pumping equipment within two hours of responding to the situation. Aeration dissipated the odor nearly immediately. No fish were killed in this event. This was likely due to the fact that much of the overflow was very dilute from rain flow and groundwater inflow and infiltration entering the station.

Our sewer pumping stations transmit failures at the station via SCADA equipment. Under normal circumstances, the crew responsible for monitoring the station for alarms can remotely correct failures. We have staff available 24 hours a day, seven days a week that are licensed, certified by the state, trained and qualified to perform routine maintenance, such as the replacement of pumps, antenna, power breakers, electronic circuit boards, and wiring to the electronics. We also have the capability to set float switch points, such as those that trigger the pump to operate and those that trigger high water alarms.

As we do not presently have a licensed electrician on staff, we contract out any primary electrical work from the Georgia Power pole to the main breaker at the station. All points beyond the main breaker at the station are maintained by JWSC staff or Data Flow Systems (DFS), our SCADA hardware and software provider. The JWSC management has approved adding a licensed master electrician in the coming fiscal year, contingent upon budget adoption.

After investigations over the weekend (6/9-6/12), it appears that the remote control communications device, called the Telemetry Control Unit or TCU, malfunctioned. The two submersible pumps at the station did not fail and testing has confirmed that they are in working order, having been replaced with new pumps on or about October of 2016. Burned contacts were cited, which would have caused the TCU to not give the pumps the “run” command. The red alarm light on top of the station, which activates independently from the TCU contacts, did engage. However, an audible horn and alarms to SCADA did not transmit by radio to the on-call staff member. In a certain sense, the redundant alarms failed, as did the TCU, creating the “perfect storm” effect. That doesn’t fully explain the lack of alarms we expected by radio, as the programming logic generally dictates that a fault code would be sent if communications fails. Our present system does not have a feature available that would enable an alarm via SCADA if a pump hasn’t run within a specified period of time.

Staff will be communicating with both DFS and our electrical contractor to determine what caused the failure, whether it was a hardware failure, a power surge, a power phase problem, lightning, etc., and how to minimize the risk of failure in the future. Rest assured that this failure was isolated and there are no indications that any of the other pumping stations have suffered from the same electronics/electrical failure at this time.

Sanitary sewer overflows are not a new occurrence. Aging infrastructure continues to pose challenges. During a reorganization of the Systems Pumping and Maintenance Division in 2014, policies and procedures were updated to more accurately follow EPA and EPD guidelines, and SSOs are being more faithfully declared.

Contact for Any Additional Information:

Kirk Young, Superintendent
Systems Pumping and Maintenance Division
Brunswick-Glynn County Joint Water and Sewer Commission
Phone Number 912-261-7152
Email kyoung@bgjwsc.org

###

This notice is being made available immediately to all local print and radio media to allow for publication and notification. A formal advertisement will be run in the Brunswick News at the next regular printing to satisfy the statutory needs to distribute via a local paper of record.

Road Closure – 2200 Block of Pinewood Drive in Brunswick – Monday, June 12, 2017

Attention

Road Closure Notification

In order to perform sewer main repairs in the area, the 2200 block of Pinewood Drive in Magnolia Park will be closed to thru traffic, between Poinsetta Circle and Cherry Street, from 8:00 a.m. on Monday, June 12th, 2017 until 5:00 p.m. on Tuesday, June 13th, 2017. Homeowner access will be maintained but all other traffic should be prepared to take another route.

For more information on the project, please contact Jay Sellers at 912.261.7123 or Charita Emory at 912.261.7151.

The BGJWSC apologizes in advance for the inconvenience.

Urbana Park Area Improvements

Firefighter Casey Spradlin tests hydrant flow in the Urbana Park area on May 19, 2017.

The Brunswick-Glynn Joint Water & Sewer Commission is pleased to announce that repairs made to the BGJWSC water system within the Urbana area of the City of Brunswick yielded both increased flow capacity and water pressure increases for the homes in the affected area as well as increases in pressure at associated fire hydrants in that area.  The result is a substantial improvement in firefighting capabilities.

Since November, 2015, the BGJWSC has been working in conjunction with the City of Brunswick to upgrade water, sewer, storm drainage and paving in the area known as Urbana Park within the City limits. This section of Brunswick, located in the grid between Gloucester Street and L Street from MLK Jr. Boulevard to Hwy 17, has not seen significant utility improvements in 40-plus years, leading to low fire protection and domestic service pressure due to corrosion in water mains which obstructed the flow in those water lines, much like clogged arteries. These old corroded and obstructed lines are a major concern for the BGJWSC, as the resulting low pressure puts many homes at higher risk of total loss due to fires that could not be controlled with the available water. BGJWSC staff teams with City of Brunswick Fire Department personnel in testing the water pressure at fire hydrants throughout the service area. Tests conducted in the Urbana Park area since the construction achieved substantial completion indicate much greater pressures and flows at the fire hydrants in this area.

Firefighter Casey Spradlin tests fire flow while Capt. Peter John Buglino and Water Distribution Superintendent Derrick Simmons monitor the progress.

Todd Kline, Senior Engineer of the BGJWSC, stated that “Thanks to the improvements that we’ve seen within the Urbana Park area, we’re taking the initiative to identify areas lacking sufficient fire protection. The policy on how that need is defined is being developed now. We look forward to outlining that initiative with a visual of areas that have the greatest need.” Kline went on to say that crews supervised by Derrick Simmons, Water Distribution Superintendent, will work closely with staff from both the City of Brunswick Fire Department and the Glynn County Fire Department to closely monitor results from routine fire flow testing and will prepare a map for the public highlighting the areas of concern which will accompany project updates delivered to Commissioners on a monthly basis during public meetings.

With the success of this project, the BGJWSC is seeking to identify other areas of concern within all districts, especially where low pressure will affect fire protection. While some of this repair and replacement can be completed by BGJWSC staff, some projects exceed our existing staff’s capability. Where funding is available, BGJWSC will seek to prioritize contracts that will enable us to quickly and effectively improve fire service pressure across our entire user base. As SPLOST 2016 funding is focused upon major sanitary sewer collection system upgrades, any immediate upgrades will be funded by user rates from the regular operations. Any urgent project that is presently unfunded may require other funding sources to cover the cost.

BGJWSC Executive Director Jimmy Junkin added “As fire protection is a service that is utilized by not only rate payers but also visitors to Glynn County, we are going to be making significant investments of both time and money to ensure that anyone that is able to make use of our services will have confidence and trust that the water pressure and volume will be there when it’s needed.”

Compliance & Legislative Committee Meeting – Wednesday, June 14, 2017 @ 1:00 PM-CANCELLED

For your consideration, please review the agenda for the Compliance & Legislative Committee Meeting scheduled for Wednesday, June 14, 2017 at 1:00 pm in the Commission Meeting Room:

*** Please note that this meeting has been CANCELLED ***

Compliance_and_Legislative_Committee_Meeting_Public_Notice_June_14,_2017_1_PM-CANCELLED – Posted 6/13/17

Compliance_and_Legislative_Committee_Meeting_Public_Notice_June_14,_2017_1_PM – Agenda Pending – Posted 6/6/17.

Road Closure – 300 Block of Myrtle Street on St. Simons Island – Thursday, June 8, 2017

Attention
Road Closure Notification

In order to perform sewer main repairs in the area, the 300 block of Myrtle St on St. Simons Island, between Beachview Drive and Park Lane, will be closed to thru traffic from 8:00 a.m. until 5:00 p.m. on Thursday, June 8th, 2017. Homeowner access will be maintained but all other traffic should be prepared to take another route.

For more information on the project, please contact Jay Sellers at 912.261.7123 or Charita Emory at 261.7151.

The BGJWSC apologizes in advance for the inconvenience.