District and General Location: PS 2033 on 2913 Lawrence Road, Saint Simons Island PS 2034 on 130 Rice Mill Road, Saint Simons Island
Total Budget: $1.4M
Anticipated Construction Completion Date: TBD
Details: The project consists of the rehabilitation of Pump Station 2033 and 2034 due to the existing condition North end of Saint Simons Island.
Purpose: The purpose of the project is to ensure continuous delivery of wastewater to the Dunbar Treatment Plant. Improvements include replacing pumps, equipment, electrical, and control systems.
Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: Located in the Saint Simons Island District along Lawrence Road.
Total Budget: $700k
Anticipated Construction Completion Date: TBD
Details: The project consists of installing new pumps, discharge piping, and a parallel forcemain.
Purpose: The purpose of the project is to operate with better efficiency, reduce maintenance and provide up-to-date monitoring with enhanced technology. And for the new sewer main installation to reduce maintenance calls and disruptions.
Have More Questions?
Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District
Total Budget: $750k
Anticipated Construction Completion Date: TBD
Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system. The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and needs to be upgraded or replaced.
Purpose: The purpose of the project, outdated equipment in remote locations where human monitoring or operation would be highly inefficient.
Have More Questions? Please Contact David Grantham, SCADA System Administrator by email here: dgrantham@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District.
Total Budget: $1.21M
Anticipated Construction Completion Date: TBD
Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan.
Purpose: The purpose of the loan is to replace aging assets to maintain a high level of service and reliability at the water production and distribution of potable water and to provide for sewage collection, treatment and disposal at the wastewater treatment plants.
Have More Questions? Please Contact LaDonnah S. Roberts, Deputy Executive Director by email here: lroberts@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
Total Budget: $7.2M
Anticipated Construction Completion Date: Summer 2022
Details: The project has a variety of system improvement projects related to rehabilitation or replacement of unit processes and facilities at the plant to ensure continuous and reliable operations.
Purpose: The purpose of the project is to more effectively treat current flows and treat the estimated future flows, ensure long-term functionality, and Federal and State permit compliance.
Have More Questions? Please contact Andrew Burroughs, P.E., Executive Director – aburroughs@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: North Mainland District Pump Station 4036 Gravity Basin
Total Budget: $1M
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter
Purpose: The purpose of the CIPP process is to reduce and eliminate cracks, and holes that would otherwise allow rainwater and roots to enter the sewer pipe and cause operational problems such as stoppages and overflows.
Have More Questions? Please contact W. Todd Kline, P.E., Director of Engineering tkline@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):
District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District
Total Budget: $250k
Anticipated Construction Completion Date: TBD
Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure.
Purpose: The purpose of the project is to improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flow throughout the system.
Have More Questions? Please Contact Superintendent, by email here: dsimmons@bgjwsc.org
Visual Summary:
Monthly Active Construction Project Photo Report(s):