Project Info – Mainland – Basin 4036 CIPP

  • Project Number: #2001
  • District and General Location: North Mainland District Pump Station 4036 Gravity Basin
  • Total Budget: $1M
  • Anticipated Construction Completion Date: Summer 2022
  • Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter
  • Purpose: The purpose of the CIPP process is to reduce and eliminate cracks, and holes that would otherwise allow rainwater and roots to enter the sewer pipe and cause operational problems such as stoppages and overflows.
  • Have More Questions? Please contact W. Todd Kline, P.E., Director of Engineering tkline@bgjwsc.org

Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_April_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036

2022_May_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036

2022_June_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036

Project Info – Mainland – SPLOST 2016 Forcemain Reroute

  • Project Number: #702
  • District and General Location: North Mainland District along Harry Driggers Blvd, Canal Road, and Ogden Road
  • Total Budget: $4.7
  • Anticipated Construction Completion Date: Summer 2022
  • Details: The project consists of nearly 20,000 linear feet of 12- to 20-inch forcemain and 2,500 linear feet of 12 to 14-inch watermain will be installed via an open cut or trenchless directional drill method.
  • Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings and wear on existing pump station equipment.
  • Have More Questions? Please contact W. Todd Kline, P.E., Director of Engineering – tkline@bgjwsc.org

Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_April_Project_Photos_-_Mainland_NMSI_PHII_Forcemain_Re_-_Route

Project Info – Systemwide – Annual Galvanized Replacement Program

  • Project Number: #2021
  • District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District
  • Total Budget: $250k
  • Anticipated Construction Completion Date: TBD
  • Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure.
  • Purpose: The purpose of the project is to improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flow throughout the system.
  • Have More Questions? Please Contact Superintendent, by email here: dsimmons@bgjwsc.org

Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_April_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_May_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_July_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_August_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_September_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_October_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_November_Project_Photos_-_Galvanized-Replacements-System-Wide

2022_December_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_January_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_February_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_March_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_April_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_May_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_June_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_July_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_August_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_September_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_October_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_November_Project_Photos_-_Galvanized-Replacements-System-Wide

2023_December_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_January_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_February_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_April_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_May_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_June_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_July_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_August_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_September_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_October_Project_Photos_-_Galvanized-Replacements-System-Wide

2024_November_Project_Photos_-_Galvanized-Replacements-System-Wide

Project Info – Mainland Brunswick – Pump Station 4035-4036 Upgrade

  • Project Number: #702
  • District and General Location: PS4035 on Ross Road, North Mainland District and PS4036 on B&W Grade Road, North Mainland District
  • Total Budget: $2.6M
  • Anticipated Construction Completion Date: Spring 2022
  • Details: The project consists of the repair of both station building roofs, painting, along with pump and piping modifications. Detailed station work includes the installation magnetic flow meter, an odor control unit, replacing outdated electrical and SCADA equipment, and building repairs with site improvements.
  • Purpose: The project aims to address the aging infrastructure, increase capacity to serve the area, and ensure the reliable operation of these critical wastewater facilities.
  • Have More Questions? Please contact W. Todd Kline, P.E., Director of Engineering – tkline@bgjwsc.org

Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_April_Project_Photos_-_Mainland_NMSI_PHII_Pumpstation_4035_4036_Upgrades