Project Info – City Brunswick – Brunswick Villa Area Sewer Extension

    • Project Number:
    • District and General Location: The City of Brunswick District in the Brunswick Villa Area Neighborhood
    • Total Budget: $2.75M
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of extending the sewer to the Brunswick Area Neighborhood where public sewer maintained by the JWSC is not available. These areas may be undeveloped properties, but most often consists of existing residences or even entire subdivisions that rely on individual septic tanks for on-site wastewater management.
    • Purpose: The purpose of the project is to replace aging septic systems and protect water quality, public health, and the environment.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

2024 October Brunswick Villa Area Sewer Extension

2024 October Brunswick Villa Area Sewer Extension (2)

2024 November Brunswick Villa Area Sewer Extension

2024 November Brunswick Villa Area Sewer Extension (2)

2024 December Brunswick Villa Area Sewer Extension (2)

2024 December Brunswick Villa Area Sewer Extension

2025 January Brunswick Villa Area Sewer Extension (2)

2025 January Brunswick Villa Area Sewer Extension

2025 February Brunswick Villa Area Sewer Extension

2025 March Brunswick Villa Area Sewer Extension

2025 April Brunswick Villa Area Sewer Extension

2025 May Brunswick Villa Area Sewer Extension

2025 June Brunswick Villa Area Sewer Extension

2025 July Brunswick Villa Area Sewer Extension

2025 August Brunswick Villa Area Sewer Extension

Project Info – SSI – Wesley Oak Circle Watermain Improvements

    • Project Number:
    • District and General Location: Saint Simons Island District in the Westley Oak Neighborhood Subdivision
    • Total Budget: $450K
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of replacing the 2-inch galvanized watermain loop with 6-inch and 8-inch sections.
    • Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the consequence of a failure to the service area (i.e., size of community impact). Those areas with the greatest need where repairs would have the greatest impact are where JWSC focuses the efforts.
    • Have More Questions? Please Contact Derrick Simmons, Water Distribution Superintendent
      dsimmons@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

2024 APRIL WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS

2024 MAY WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS

2024 JUNE WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS

2024 JULY WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS

2024 August WESLEY OAKS CIRCLE WATERMAIN IMPROVEMENTS

Project Info – SSI – Ocean Boulevard Water Improvements

    • Project Number:
    • District and General Location: Saint Simons Island District along Ocean Boulevard
    • Total Budget: $1.75M
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of replacing the existing watermain from East Beach to the Village on Saint Simons Island.
    • Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the consequence of a failure to the service area (i.e., size of community impact). Those areas with the greatest need where repairs would have the greatest impact are where JWSC focuses the efforts.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

Project Info – North Mainland WPCF Land Acquisition and Engineering

    • Project Number:
    • District and General Location: Located in the North Mainland District
    • Total Budget: $TBD
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of purchasing the property and plant engineering design to meet future infrastructure and system needs.
    • Purpose: The purpose of the project is to secure a future public wastewater treatment plant site to serve the North Mainland District residents on the public sewer system.
    • Have More Questions? Please Contact Andrew Burroughs, P.E., Executive Director by email here: aburroughs@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

Project Info – South Mainland – Pump Station 3114 Forcemain Reroute

    • Project Number:
    • District and General Location: South Mainland District along South Port Parkway to the South Port Wastewater Treatment Plant
    • Total Budget: $400k
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of separate forcemain and reroutes to the head of the plant.
    • Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings and wear on existing pump station equipment.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

Project Info – SSI – Pump Station 2033 and 2034 Rehab

    • Project Number:
    • District and General Location: PS 2033 on 2913 Lawrence Road, Saint Simons Island PS 2034 on 130 Rice Mill Road, Saint Simons Island
    • Total Budget: $1.4M
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of the rehabilitation of Pump Station 2033 and 2034 due to the existing condition North end of Saint Simons Island.
    • Purpose: The purpose of the project is to ensure continuous delivery of wastewater to the Dunbar Treatment Plant.  Improvements include replacing pumps, equipment, electrical, and control systems.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

Project Info – SSI – Pump Station 2056 Pumps and Forcemain Improvements

    • Project Number:
    • District and General Location: Located in the Saint Simons Island District along Lawrence Road.
    • Total Budget: $700k
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of installing new pumps, discharge piping, and a parallel forcemain.
    • Purpose: The purpose of the project is to operate with better efficiency, reduce maintenance and provide up-to-date monitoring with enhanced technology. And for the new sewer main installation to reduce maintenance calls and disruptions.
    • Have More Questions?
    • Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

Project Info – Mall EST and Oglethorpe EST Rehab

    • Project Number:
    • District and General Location: Glynn Place Mall EST, North Mainland District Oglethorpe EST, Saint Simons Island District.
    • Total Budget: $1M
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of rehabilitation and painting for the Elevated Storage Tank (EST) at Glynn Place Mall EST and Oglethorpe EST.
    • Purpose: The purpose of the project is to provide reliable water supply and pressure for the surrounding community and fire suppression needs while preserving water quality and meeting regulatory requirements.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_November_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2022_December_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_January_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_February_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_March_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_April_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_June_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_July_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_August_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_September_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_October_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_NOVEMBER_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2023_December_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_January_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_February_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_April_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_MAY_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_May_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES (2)

2024_JUNE_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

2024_JULY_EST_REHAB_AT_GLYNN_PLACE_MALL_AND_OGLETHORPE_SITES

Project Info – North Mainland – Pump Station 4105 Forcemain Reroute

    • Project Number:
    • District and General Location: Located in the North Mainland District along Cate Road and Crispen Boulevard toward Highway 341.
    • Total Budget: $1.25M
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of installing a new forcemain from Pump Station 4105 to Highway 341
    • Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings and wear on existing pump station equipment.
    • Have More Questions? Please Contact W. Todd Kline, P.E., Director of Engineering by email here: tkline@bgjwsc.org

    Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_May_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2022_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2022_August_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_June_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)

2024_July_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_July_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)

2024_August_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_September_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_September_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)

2024_October_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_November_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_November_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)

2024_December_Project_Photos_North_Mainland_4105_Forcemain_Reroute

2024_December_Project_Photos_North_Mainland_4105_Forcemain_Reroute (2)

Project Info – Systemwide – Water Production SCADA

    • Project Number:
    • District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District
    • Total Budget: $750k
    • Anticipated Construction Completion Date: TBD
    • Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system.  The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and needs to be upgraded or replaced.
    • Purpose: The purpose of the project, outdated equipment in remote locations where human monitoring or operation would be highly inefficient.
    • Have More Questions? Please Contact David Grantham, SCADA System Administrator by email here: dgrantham@bgjwsc.org